Line 69: | Line 69: | ||
<td>Yes-to marginal</td> | <td>Yes-to marginal</td> | ||
<td>See comments above</td> | <td>See comments above</td> | ||
− | |||
</tr> | </tr> | ||
<tr> | <tr> |
BMP Family | BMP | Classification | Notes |
---|---|---|---|
Temporary Construction Sediment Control | Preconstruction planning | Yes | Focus on sequencing to avoid open soils during winter and on limited grading prior to freeze-up |
Resource protection | Yes | Buffers reduce runoff by providing infiltration potential | |
Runoff control | Yes | Stable drainageways and sediment basins assure erosion control and provide storage opportunities for spring meltwater | |
Perimeter control | Yes | These practices are especially effective during winter construction | |
Slope stabilization | Yes | These must be installed prior to freeze-up to be effective; they must be checked often and maintained all winter | |
Stabilized soil | Marginal | Seeding, blankets and sprayed stabilizers must all be in place and working before freeze-up; if necessary, blankets can be laid and held in place with sandbags or rock logs | |
Inspection and maintenance | Yes | Essential for proper operation all winter | |
Bioretention | Rain garden | Marginal | By definition, these are growing season practices, but they do provide a sump area for storage and some infiltration during a melt |
Depressed parking islands | Yes | These can provide needed storage during the cold season and for spring runoff events; vegetation will not be a factor during winter | |
Filtration | Media filter | Yes-to marginal | Surface systems need to be fully dry before freezeup for these to work properly; sub-grade systems can be very effective for meltwater treatment |
Surface vegetative filter | Marginal | Vegetative filtering is reduced once vegetation dies back in the fall; some physical filtering will occur if vegetation density and depth are sufficient | |
Combination filter | Yes-to marginal | See comments above | |
Infiltration | Trench | Yes with caution | Effective when designed, installed and maintained properly; caution applies to limitations on source area to avoid high concentrations of Cl and toxics |
Basin | Yes with caution | See above comment | |
Stormwater Ponds | Forebay | Yes | Effective if designed with enough available volume to accommodate meltwater in the spring |