m |
m |
||
Line 99: | Line 99: | ||
<font size=1><sup>1</sup>If changing the test strip length, adjust the title in column C and the multiplier in column E.</font size> | <font size=1><sup>1</sup>If changing the test strip length, adjust the title in column C and the multiplier in column E.</font size> | ||
− | [[category: | + | <noinclude> |
+ | [[category:Chloride table]] | ||
+ | </noinclude> |
Example calibration chart for gravity flow equipment
Link to this table
Equipment: | ||||||
Material: | ||||||
Date: | ||||||
A | B | C | D | E | F | G |
---|---|---|---|---|---|---|
Speed | Lever position or gate setting | Pounds spread in 10 feet1 | Spread width in feet | Coverage area in sq. ft. (D x 10)* | Application rate in lbs./1000 ft2 (1000/E x C) | Application rate in lbs./lane mile (12’ width) (F x 63.4) |
Example | ||||||
20 MPH | Half-closed | 0.4 lbs | 13 feet | 130 sq. ft. | 3.1 lbs. per 1000 sq. ft. | 196 lbs./mile |
1If changing the test strip length, adjust the title in column C and the multiplier in column E.