(Created page with " <center><font size=3>''BMP design considerations for ground water aquifer protection</font size>'''<br> Link to this [[BMP design considerations for ground water aquifer prot...")
 
Line 8: Line 8:
 
<tr>
 
<tr>
 
<td>Bioretention</td>
 
<td>Bioretention</td>
<td>*OK with proper caution for PSH</td>
+
<td>
 +
*OK with proper caution for PSH</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>

Revision as of 22:19, 15 January 2013

BMP design considerations for ground water aquifer protection'
Link to this table
BMP Group Design Consideration
Bioretention
  • OK with proper caution for PSH
Filtration
  • OK with proper caution for PSH
  • Open channels are OK, but polluted runoff must be adequately pretreated
Infiltration
  • Provide a 100-foot horizontal separation distance from wells and three-foot vertical distance from the water table
  • No PSH runoff, unless treated by another practice, such as a filtering system
  • Needed pre-treatment of all runoff except rooftop
Stormwater Ponds
  • Needed liner if A soils or active karst are present
  • Pre-treat PSH runoff
  • Provide a separation distance from well or water table to BMP
Constructed Stormwater Wetlands
  • May needed liner if A soils or active karst are present
  • Pre-treat PSH runoff
  • Provide a separation distance from well or water table to BMP