m
m
Line 60: Line 60:
 
</table>
 
</table>
 
<font size =1>
 
<font size =1>
[http://www.vwrrc.vt.edu/swc/april_22_2010_update/DCR_BMP_Spec_No_8_INFILTRATION_Final_Draft_v1-8_04132010.htm Virginia]<br>
+
*[http://www.vwrrc.vt.edu/swc/april_22_2010_update/DCR_BMP_Spec_No_8_INFILTRATION_Final_Draft_v1-8_04132010.htm Virginia]<br>
[https://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permit-guidance/stormwater-bmp-manual North Carolina]<br>
+
*[https://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permit-guidance/stormwater-bmp-manual North Carolina]<br>
[http://www.dep.wv.gov/WWE/Programs/stormwater/MS4/Pages/StormwaterManagementDesignandGuidanceManual.aspx West Virginia]<br>
+
*[http://www.dep.wv.gov/WWE/Programs/stormwater/MS4/Pages/StormwaterManagementDesignandGuidanceManual.aspx West Virginia]<br>
[http://www.maine.gov/dep/land/stormwater/stormwaterbmps/ Maine]<br>
+
*[http://www.maine.gov/dep/land/stormwater/stormwaterbmps/ Maine]<br>
[http://tahoebmp.org/bmphandbook.aspx]<br>
+
*[http://tahoebmp.org/bmphandbook.aspx Lake Tahoe]<br>
[http://www.ct.gov/deep/cwp/view.asp?a=2721&q=325704 Connecticut]<br>
+
*[http://www.ct.gov/deep/cwp/view.asp?a=2721&q=325704 Connecticut]<br>
[http://www.mass.gov/eea/agencies/massdep/water/regulations/massachusetts-stormwater-handbook.html Massachusetts]<br>
+
*[http://www.mass.gov/eea/agencies/massdep/water/regulations/massachusetts-stormwater-handbook.html Massachusetts]<br>
[http://www.dec.ny.gov/chemical/29072.html New York]<br>
+
*[http://www.dec.ny.gov/chemical/29072.html New York]<br>
[http://dnr.wi.gov/topic/stormwater/documents/StormwaterManual2-TechnicalDesign.pdf Wisconsin]<br>
+
*[http://dnr.wi.gov/topic/stormwater/documents/StormwaterManual2-TechnicalDesign.pdf Wisconsin]<br>
[http://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/Resources/sw_manual-vol1.pdf Vermont]<br>
+
*[http://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/Resources/sw_manual-vol1.pdf Vermont]<br>
[http://des.nh.gov/organization/divisions/water/stormwater/manual.htm New Hampshire]<br>
+
*[http://des.nh.gov/organization/divisions/water/stormwater/manual.htm New Hampshire]<br>
[https://www.ontario.ca/document/stormwater-management-planning-and-design-manual Ontario]<br>
+
*[https://www.ontario.ca/document/stormwater-management-planning-and-design-manual Ontario]<br>
[http://www.elibrary.dep.state.pa.us/dsweb/View/Collection-8305 Pennsylvania]
+
*[http://www.elibrary.dep.state.pa.us/dsweb/View/Collection-8305 Pennsylvania]
 
</font size>
 
</font size>
  
 
[[category:Table]]
 
[[category:Table]]

Revision as of 16:04, 7 July 2016

Stormwater infiltration BMPs - contributing drainage area
Link to this table

Stormwater BMP Recommended contributing area Notes References
Infiltration Basin 50 acres or less A natural or constructed impoundment that captures, temporarily stores and infiltrates the design volume of water into the surrounding naturally permeable soil over several days. In the case of a constructed basin, the impoundment is created by excavation or embankment. [1], [2], [3], [4], [5], [6], [7], [8], [9], [10], [11], [12], [13]
Bioinfiltration Basin 5 acres or less Bioinfiltration basins must meet the required 48 hour drawdown time and must be sized in order to allow for adequate maintenance. It is HIGHLY RECOMMENDED that bioinfiltration basins be designed to prevent high levels of bounce as submerging vegetation may inhibit plant growth. A maximum wet storage depth of 1.5 feet is HIGHLY RECOMMENDED.
Infiltration Trench 5 acres or less
Dry Well Synonym: Infiltration Tube, French Drain, Soak‐Away Pits, Soak Holes 1 acre or less (rooftop only)
Underground Infiltration 10 acres or less
Dry Swale with Check Dams 5 acres or less
Permeable Pavement It is RECOMMENDED that external contributing drainage area not exceed the surface area of the permeable pavement. It is HIGHLY RECOMMENDED that external contributing drainage area not exceed twice the surface area of the permeable pavement It is RECOMMENDED that external drainage area be as close to 100% impervious as possible. Field experience has shown that drainage area (pervious or impervious) can contribute particulates to the permeable pavement and lead to clogging. Therefore, sediment source control and/or pre-treatment should be used to control sediment run-on to the permeable pavement section.
Tree Trench/Tree Box up to 0.25 acres per tree