(Created page with "<center><font size=3>'''Typical winter decommission and maintenance tasks'''</font size><br> Link to this table</center>...") |
|||
Line 11: | Line 11: | ||
<tr> | <tr> | ||
<td>'''Source Area/Collection Surface'''</td> | <td>'''Source Area/Collection Surface'''</td> | ||
− | <td>*Clean residual de-icing material (sand, salt) from pavement prior to spring startup </td> | + | <td> |
+ | *Clean residual de-icing material (sand, salt) from pavement prior to spring startup </td> | ||
</tr> | </tr> | ||
Line 18: | Line 19: | ||
<tr> | <tr> | ||
<td>'''Collection System'''</td> | <td>'''Collection System'''</td> | ||
− | <td>*Drain and disconnect conveyances to prevent freeze/thaw damage</td> | + | <td> |
+ | *Drain and disconnect conveyances to prevent freeze/thaw damage</td> | ||
</tr> | </tr> | ||
Component | Typical decommissioning and winter maintenance tasks needed prior to spring startup 1 |
---|---|
Source Area/Collection Surface |
|
Collection System |
|
Storage System | *Drain all water from above-ground outdoor storage tanks
|
Treatment System | *Drain and disconnect any pre-storage treatment devices that should be decommissioned during the winter
|
Distribution System | *Switch end use supply from harvested water to public water supply (if necessary)
|
Overflow/Bypass Systems | *Drain and disconnect to prevent freeze/thaw damage |