m |
m |
||
Line 15: | Line 15: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <th colspan=2>Water quality</th> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 30: | Line 30: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <th colspan=2>Pollutant removal</th> |
</tr> | </tr> | ||
<tr> | <tr> |
Expected performance for temporary vehicle tracking BMPs.
Link to this table
Water quantity | |
---|---|
Flow attenuation | Little or no design benefit |
Runoff volume reduction | Little or no design benefit |
Water quality | |
Erosion prevention | Little or no design benefit |
Sediment control | Primary design benefit |
Nutrient loading | Secondary design benefit |
Pollutant removal | |
Total suspended solids | Primary design benefit |
Total phosphorus | Secondary design benefit |
Heavy metals | Secondary design benefit |
Floatables | Little or no design benefit |
Oil and grease | Little or no design benefit |