m
m
Line 6: Line 6:
 
<th>Item </th>
 
<th>Item </th>
 
<th>Corrective Action Required if</th>
 
<th>Corrective Action Required if</th>
<th>Corrective Action</th>
+
<th>Corrective Action<sup>1</sup></th>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Storm drain inlet protection</td>
 
<td>Storm drain inlet protection</td>
<td>Inlet opening unprotected
+
<td>
Emergency overflow not provided where required
+
#Inlet opening unprotected
Device not cleaned out
+
#Emergency overflow not provided where required
Improper inlet protection for scope of work
+
#Device not cleaned out
Flooding occurring in public use drive lanes
+
#Improper inlet protection for scope of work
 +
#Flooding occurring in public use drive lanes
 
</td>
 
</td>
 
<td>
 
<td>
*Immediately install inlet control device appropriate to the work
+
#Immediately install inlet control device appropriate to the work
*Immediately correct missing overflow condition
+
#Immediately correct missing overflow condition
*Immediately restore function of inlet control device
+
#Immediately restore function of inlet control device
*Immediately correct inlet device for scope of work
+
#Immediately correct inlet device for scope of work
*Immediately correct flooding condition by changing device or flow constriction
+
#Immediately correct flooding condition by changing device or flow constriction
 
</td>
 
</td>
 
</tr>
 
</tr>
 
</table>
 
</table>
 +
<font size=1><sup>1</sup>The number corresponds with the same number in the column "Corrective Action Required"</font size>
  
 
[[category:Table]]
 
[[category:Table]]

Revision as of 19:05, 21 October 2016

Temporary Sediment Control: Corrective Actions
Link to this table

Item Corrective Action Required if Corrective Action1
Storm drain inlet protection
  1. Inlet opening unprotected
  2. Emergency overflow not provided where required
  3. Device not cleaned out
  4. Improper inlet protection for scope of work
  5. Flooding occurring in public use drive lanes
  1. Immediately install inlet control device appropriate to the work
  2. Immediately correct missing overflow condition
  3. Immediately restore function of inlet control device
  4. Immediately correct inlet device for scope of work
  5. Immediately correct flooding condition by changing device or flow constriction

1The number corresponds with the same number in the column "Corrective Action Required"