m |
m |
||
Line 26: | Line 26: | ||
<tr> | <tr> | ||
<td>Sediment control</td> | <td>Sediment control</td> | ||
− | <td>Secondary design | + | <td>Secondary design benefit</td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 37: | Line 37: | ||
<tr> | <tr> | ||
<td>Total suspended solids</td> | <td>Total suspended solids</td> | ||
− | <td>Secondary design | + | <td>Secondary design benefit</td> |
</tr> | </tr> | ||
<tr> | <tr> |
Expected performance for outlet energy dissipators
Link to this table
Water Quantity | |
---|---|
Flow attenuation | Little or no design benefit |
Runoff volume reduction | Little or no design benefit |
Water Quantity | |
Pollution prevention | |
Soil erosion | Primary design benefit |
Sediment control | Secondary design benefit |
Nutrient loading | Little or no design benefit |
Pollutant removal | |
Total suspended solids | Secondary design benefit |
Total phosphorus | Little or no design benefit |
Heavy metals | Little or no design benefit |
Floatables | Little or no design benefit |
Oil and grease | Little or no design benefit |