(Created page with "<center><font size=3>'''Expected performance for perimeter control'''</font size><br> Link to this table</center> <table class...")
 
Line 35: Line 35:
 
<tr>
 
<tr>
 
<td>Sediment control</td>
 
<td>Sediment control</td>
<td>Primary design benefit</td>
+
<td>Primary design benefit</td>
 
</tr>
 
</tr>
  
Line 60: Line 60:
 
<tr>
 
<tr>
 
<td>Heavy  metals</td>
 
<td>Heavy  metals</td>
<td>Primary design benefit
+
<td>Secondary design benefit</td>
  Secondary design benefit
 
</td>
 
 
</tr>
 
</tr>
  

Revision as of 16:41, 24 October 2016

Expected performance for perimeter control
Link to this table
Water Quantity
Flow attenuation Little or no design benefit
Runoff volume reduction Little or no design benefit
Water Quantity
Erosion prevention Little or no design benefit
Sediment control Primary design benefit
Nutrient loading Secondary design benefit
Pollutant removal
Total suspended solids Primary design benefit
Total phosphorus Secondary design benefit
Heavy metals Secondary design benefit
Floatables Little or no design benefit
Oil and grease Little or no design benefit