(Created page with "<center><font size=3>'''Expected performance for check dams'''</font size><br> Link to this table</center> <table class="sortable">...") |
|||
Line 61: | Line 61: | ||
<tr> | <tr> | ||
<td>Total phosphorus</td> | <td>Total phosphorus</td> | ||
− | <td> | + | <td>Secondary design benefit</td> |
</tr> | </tr> | ||
Water Quantity | |
---|---|
Flow attenuation | Secondary design benefit |
Runoff volume reduction | Secondary design benefit |
Water Quantity | |
Pollution prevention | |
Erosion prevention (i.e., for channel banks) | Primary design benefit |
Sediment control | Secondary design benefit |
Nutrient loading | Secondary design benefit |
Pollutant removal | |
Total suspended solids | Secondary design benefit |
Total phosphorus | Secondary design benefit |
Heavy metals | Secondary design benefit |
Floatables | Secondary design benefit |
Oil and grease | Secondary design benefit |