m |
|||
Line 1: | Line 1: | ||
− | + | No energy dissipation is installed at pipe outlet. Energy dissipation must be installed within 24 hours after pipe outlet connects to a surface water. |
No energy dissipation is installed at pipe outlet. Energy dissipation must be installed within 24 hours after pipe outlet connects to a surface water.
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 16:11, 3 November 2016 | 640 × 480 (133 KB) | Mtrojan (talk | contribs) |
You cannot overwrite this file.
The following page uses this file: