(Created page with "The following documents were submitted by the contractor as final drafts. The information from these was used to update the manual. The documents may have undergone slight for...")
 
m
Line 5: Line 5:
 
*[[file:Stabilization.docx]]
 
*[[file:Stabilization.docx]]
 
*[[file:Vehicle-tracking Perimeter-control Check-dams.docx]]
 
*[[file:Vehicle-tracking Perimeter-control Check-dams.docx]]
 +
*[[File:BMP removal working in dry temp crossing.docx]]
 +
*[[File:Buffers riprap dewatering.docx]]
 +
*[[File:Traps paper and berm paper.docx]]
 +
*[[File:Winter Construction Practices final.docx]]

Revision as of 15:09, 20 July 2022

The following documents were submitted by the contractor as final drafts. The information from these was used to update the manual. The documents may have undergone slight formatting, but the content is essentially what was submitted by the contractor.