m |
m |
||
Line 2: | Line 2: | ||
*[[File:Overview Final.docx]] | *[[File:Overview Final.docx]] | ||
*[[File:Design guidelines final. docx.docx]] | *[[File:Design guidelines final. docx.docx]] | ||
+ | *[[File:Water Quality Considerations Final.docx]] |
The following documents were submitted by the contractor as final drafts. The information from these was used to update the manual. The documents may have undergone slight formatting, but the content is essentially what was submitted by the contractor.