m |
m |
||
Line 1: | Line 1: | ||
Blanket is not installed properly: there is no overlap between blanket segments and blanket is suspended above the ground, suggesting a rill or gully could be present. Either the ground shall be regraded and blanket re-installed or blanket should lie flat on ground. In either case blanket ends should overlap. | Blanket is not installed properly: there is no overlap between blanket segments and blanket is suspended above the ground, suggesting a rill or gully could be present. Either the ground shall be regraded and blanket re-installed or blanket should lie flat on ground. In either case blanket ends should overlap. | ||
+ | |||
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Images/Erosion prevention photos]] |
Blanket is not installed properly: there is no overlap between blanket segments and blanket is suspended above the ground, suggesting a rill or gully could be present. Either the ground shall be regraded and blanket re-installed or blanket should lie flat on ground. In either case blanket ends should overlap.
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 14:09, 18 August 2016 | 976 × 620 (122 KB) | Mtrojan (talk | contribs) |
You cannot overwrite this file.
The following 2 pages use this file:
This page was last edited on 19 December 2022, at 16:15.