Line 8: | Line 8: | ||
Best Management Practices (BMPs) to minimize erosion <br> | Best Management Practices (BMPs) to minimize erosion <br> | ||
1. [https://stormwater.pca.state.mn.us/index.php?title=Erosion_prevention_practices| Erosion control BMPs]<br> | 1. [https://stormwater.pca.state.mn.us/index.php?title=Erosion_prevention_practices| Erosion control BMPs]<br> | ||
− | 2. Schedule & effective methods to immediately stabilize soil<br> | + | 2. [https://stormwater.pca.state.mn.us/index.php?title=Erosion_prevention_practices_-_temporary_seeding_and_stabilization| Schedule & effective methods to immediately stabilize soil]<br> |
− | 3. Energy dissipation at pipe outlets<br> | + | 3. [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices_-_Outlet_energy_dissipation| Energy dissipation at pipe outlets]<br> |
− | 4. 100 foot or more buffer from a special or impaired water <br> | + | 4. 100 foot or more buffer from a [https://stormwater.pca.state.mn.us/index.php?title=Special_Waters_and_Impaired_Waters| special or impaired water] <br> |
5. Schedule to stabilize drainage ditches or swales<br> | 5. Schedule to stabilize drainage ditches or swales<br> | ||
6. Plan to route water around unstabilized areas<br> | 6. Plan to route water around unstabilized areas<br> | ||
Line 16: | Line 16: | ||
BMPs to minimize the discharge of sediment and other pollutants<br> | BMPs to minimize the discharge of sediment and other pollutants<br> | ||
− | 8. Downgradient perimeter control<br> | + | 8. [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices_-_Perimeter_controls_for_disturbed_areas| Downgradient perimeter control]<br> |
− | 9. Storm drain inlet protection<br> | + | 9. [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices_-_Storm_drain_inlet_protection| Storm drain inlet protection]<br> |
10. Sediment control for temporary soil stockpiles<br> | 10. Sediment control for temporary soil stockpiles<br> | ||
− | 11. Vehicle tracking BMPs<br> | + | 11. [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices_-_Vehicle_tracking_BMPs| Vehicle tracking BMPs]<br> |
12. Temporary sedimentation basins, if applicable<br> | 12. Temporary sedimentation basins, if applicable<br> | ||
13. 50 foot buffer maintained adjacent to surface waters or redundant sediment controls otherwise<br> | 13. 50 foot buffer maintained adjacent to surface waters or redundant sediment controls otherwise<br> |