Line 6: Line 6:
 
*[https://www.pca.state.mn.us/sites/default/files/wq-strm4-59q.pdf MPCA MCM 4 guidance] - MPCA's fact sheet highlighting all requirements related to erosion, sediment, and waste controls
 
*[https://www.pca.state.mn.us/sites/default/files/wq-strm4-59q.pdf MPCA MCM 4 guidance] - MPCA's fact sheet highlighting all requirements related to erosion, sediment, and waste controls
 
*[https://stormwater.pca.state.mn.us/index.php?title=MS4_Staff_Site_Plan_Review_Guidance MPCA Site plan review guidance] - MPCA's guidance on what elements should be evaluated during a site plan review
 
*[https://stormwater.pca.state.mn.us/index.php?title=MS4_Staff_Site_Plan_Review_Guidance MPCA Site plan review guidance] - MPCA's guidance on what elements should be evaluated during a site plan review
 +
*[[MS4 Site inspection checklist]] - MPCA's template checklist that is consistent with the Construction Stormwater Permit requirements for erosion, sediment, and waste controls for MS4 inspectors to use.

Revision as of 16:48, 3 October 2017

Constrcution site adjacent to waterbody

Controlling sediment and other pollutants from construction sites is crucial to an effective MS4 program. MS4s must have and enforce a regulatory mechanism that establishes erosion, sediment, and controls as stringent as the Construction Stormwater permit requirements for construction sites.