==Phosphorus credits== | ==Phosphorus credits== | ||
+ | ===Assumptions and factors affecting phosphorus credits for permeable pavement=== | ||
+ | ===Models and calculators for calculating permeable pavement TSS credits=== | ||
+ | The Manual does not provide specific recommendations for which values or models to use when calculating TSS credits for permeable pavement. The models discussed below are widely utilized within the stormwater community and are therefore appropriate for calculating TSS credits provided the model assumptions are met and the permeable pavement is properly designed, constructed and maintained. | ||
− | === | + | ====Minimal Impact Design Standards calculator==== |
===Literature review on phosphorus reductions for permeable pavement=== | ===Literature review on phosphorus reductions for permeable pavement=== | ||
− | |||
− | |||
==Example applications for calculating permeable pavement credits for volume, TSS and phosphorus== | ==Example applications for calculating permeable pavement credits for volume, TSS and phosphorus== |
Permeable pavement is a tool that can achieve reductions in stormwater volume and pollutant loading, thereby generating stormwater credits. Permeable pavement will achieve the greatest credit when it is properly designed, constructed and maintained.
This section provides specific information on generating and calculating credits from permeable pavement for volume, TSS and phosphorus. Permeable pavement may also be effective at reducing concentrations of other pollutants such as metals and nitrogen. This article does not provide information on calculating credits for pollutants other than TSS and phosphorus, but references are provided that may be useful for calculating credits for these other pollutants.
In high-infiltration rate soil subgrades, permeable pavement can be designed without an underdrain. When sized to capture all rain events with no overflow ever occurring, this design retains 100% of the annual runoff volume and 100% of annual pollutant loading. Permeable pavements will typically be built to meet other performance goals. For example, when designing for the MIDS performance goal for new development in sites without restrictions, the pavement must infiltrate the first 1.1 inches of rainfall.
A permeable pavement system achieves volume reductions through
The overall credit will be the sum of the storage and infiltration credit.
The storage credit is a function of the design and dimensions of the permeable pavement system, specifically the depth of the subbase below an underdrain, the area of permeable pavement and the porosity of the subbase. The storage credit (Vs) is given by
\(V_s = A_s d_p n\)
where
The storage credit, as defined by the above credit, assumes the entire pore space is available for water storage. In reality, some pores will be taken up by water and use of field capacity may provide a more accurate estimate of the storage credit. Field capacity for a coarse sand will be approximately 15% (see [1]).
Often, permeable pavement will be designed to meet a specific performance goal, such as the 1.1 inch Minimal Impact Design Standards (MIDS) goal for new development sites with no restrictions or a TMDL goal for phosphorus or TSS reductions. Specifications for designing permeable pavement systems, including a discussion of how to calculate the reservoir depth, are provided in the section covering design specifications for permeable pavement. When an underdrain exists at the bottom of the permeable pavement system, the reservoir depth equals zero and there is no storage credit.
Initial infiltration rates for permeable pavement are initially on the order of hundreds of inches per hour, which is much larger than the intensity that can be produced by a rain event. Infiltration rates usually exceed one inch per hour even when the pavement is substantially clogged (Smith and Hunt 2010). Sites that receive run-on from poorly maintained or disturbed areas had the lowest infiltration rate in a study by Bean et al. 2007. However, the infiltration rates at these sites were still high relative to rainfall intensities.
For a design with no underdrain, an infiltration credit can also be given if the reservoir storage area is exceeded during a rain event. Note that an infiltration credit is not dependent on the reservoir becoming filled since infiltration into the underlying soil begins before the reservoir fills. To avoid double counting, it is necessary to subtract the reservoir volume from the volume that infiltrated through the permeable pavement surface. An approximation of the volume infiltrated (Vi) while the reservoir is filling is given by
\(V_i = A_s i/2 t_f\)
where
Once the reservoir fills and assuming water continues to be delivered to the permeable pavement surface at a rate greater than the underlying soil, water loss will be controlled by infiltration through the underlying soil. If the reservoir fills and water continues to be delivered to the permeable pavement surface but at a rate lower than the infiltration rate into the underlying soil, the rate of water delivery determines the additional infiltration credit. In low-infiltration soils where the design will most likely include an underdrain, some infiltration of water into the subgrade occurs. The volume of water infiltrated depends on the volume of storage available below the underdrain outflow invert. The remaining filtered runoff is collected in the underdrain and exits to the storm drainage system, typically a stream or storm sewer. Equations provided for design specifications for permeable pavement can be used to calculate outflow volumes through underdrains. It is recommended that i be field verified. A typical value for tf is 2 hours (0.083 day).
Assumptions used to calculate credits may also vary with each calculator or model. To calculate credits it is important to ensure that your calculation is consistent with the assumptions made in the model or calculator you are using. Assumptions for some models or calculators are briefly discussed below. More detailed discussions of assumptions may be found in user's manuals or other documentation for the model or calculator.
The Manual does not provide specific recommendations for which values or models to use when calculating volume credits for permeable pavement. The models discussed below are widely utilized within the stormwater community and are therefore appropriate for calculating volume credits provided the model assumptions are met and the permeable pavement is properly designed, constructed and maintained.
The MIDS calculator provides a BMP volume credit based on storage within the reservoir layer (subbase) below the permeable pavement. Calculator inputs include
The user can specify an impervious area that contributes to the permeable pavement. The user can also route water through downstream BMPs.
Calculator output includes
The MIDS calculator does not provide credit for infiltration. Thus there must either be no underdrain or the underdrain must be suspended above the botton of the reservoir layer to receive a volume credit.
The water quality credits available for installation of permeable pavement depend largely on the design of the storage volume below the pavement and whether or not the runoff is filtered (through underdrain) or infiltrated. Infiltration reduces the volume of runoff and results in the most credit. The credit for pollutant reduction corresponds directly with annual volume reduction. The infiltration rate of the subgrade soil affects the annual volume reduction (the higher the infiltration rate, the higher the volume reduction). For example, if a system is designed to store and infiltrate the MIDS performance goal of 1.1 inches off impervious surfaces, it would result in an annual volume reduction of 91% for a site with HSG C subgrade soils, which corresponds to a 91% reduction in TSS. Designs that filter runoff with an underdrain at the bottom of the storage layer (on top of the subgrade) are less effective than infiltration designs. Runoff is filtered while flowing through the permeable pavement and the storage layer and out the underdrain.
Assumptions used to calculate credits may also vary with each calculator or model. To calculate credits it is important to ensure that your calculation is consistent with the assumptions made in the model or calculator you are using. Assumptions for some models or calculators are briefly discussed below. More detailed discussions of assumptions may be found in user's manuals or other documentation for the model or calculator.
The Manual does not provide specific recommendations for which values or models to use when calculating TSS credits for permeable pavement. The models discussed below are widely utilized within the stormwater community and are therefore appropriate for calculating TSS credits provided the model assumptions are met and the permeable pavement is properly designed, constructed and maintained.
If a system is designed to infiltrate the MIDS performance standard of 1.1 inches of runoff from the tributary impervious surfaces, it would result in a 91% annual runoff volume reduction from a site with hydrologic soil group (HSG) C soils (infiltration rate of 0.2 inches/hr). Annual pollutant load reductions for this example are approximately equal to the volume reduction. A site with HSG A soils (infiltration rate of 1.6 inches/hr) would result in higher annual reductions.
For designs with underdrains, the reductions are less because a portion of the water is captured by the underdrains before it can be infiltrated. Of the water intercepted and draining through the underdrain, 74% (with upper and lower 90% confidence bounds of 93% and 33%, respectively) of total suspended solids removal can be expected.
Since TSS credits are a function of the volume infiltrated, the design dimensions control TSS removal. Calculator inputs include
The user can specify an impervious area that contributes to the permeable pavement. The user can also route water through downstream BMPs.
In calculating the TSS credit, the incoming TSS load is first reduced by 74%. This accounts for TSS removal in the case where an underdrain is at the bottom of the permeable pavement system. If an underdrain is suspended above the bottom of the design, then additional reduction in TSS loading will occur as a result of infiltration below the underdrain.
Calculator output includes
For an example with discussion, see the screen shot on the right.
This section provides links to research and data on removal of TSS for permeable pavement. Users should be aware of assumptions and limitations associated with data presented in these reports or databases.
The Manual does not provide specific recommendations for which values or models to use when calculating TSS credits for permeable pavement. The models discussed below are widely utilized within the stormwater community and are therefore appropriate for calculating TSS credits provided the model assumptions are met and the permeable pavement is properly designed, constructed and maintained.
In addition to TSS and phosphorus, permeable pavement can reduce loading of the following pollutants:
Specific credits and methods for calculating credits are not provided in this section. Information on removal of these pollutant by permeable pavement systems can be found at the following links.