m |
m |
||
Line 8: | Line 8: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td>Infiltration</td> | + | <td>[https://stormwater.pca.state.mn.us/index.php?title=Stormwater_infiltration_Best_Management_Practices Infiltration]</td> |
<td> | <td> | ||
− | *Infiltration BMPs are preferred practices | + | *https://stormwater.pca.state.mn.us/index.php?title=Stormwater_infiltration_Best_Management_Practices Infiltration BMPs are preferred practices |
*Provide a minimum 3-foot separation from the seasonally-high water table, bedrock or impervious soil layer</td> | *Provide a minimum 3-foot separation from the seasonally-high water table, bedrock or impervious soil layer</td> | ||
</tr> | </tr> | ||
Line 25: | Line 25: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td>Stormwater | + | <td>[[Stormwater ponds]]<sup>1</sup></td> |
<td> | <td> | ||
*Pond aeration is encouraged | *Pond aeration is encouraged | ||
Line 38: | Line 38: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td>Constructed Stormwater | + | <td>Constructed [[Stormwater wetlands]]</td> |
<td> | <td> | ||
*Pond/ wetland system is the preferred wetland design | *Pond/ wetland system is the preferred wetland design |
Summary of stormwater design recommendations to enhance phosphorus removal.
Link to this table
BMP Design | Design recommendations |
---|---|
Infiltration |
|
Filtration (includes practices with an underdrain) |
|
Stormwater ponds1 |
|
Constructed Stormwater wetlands |
|
1The recommendations for constructed ponds are from the original Minnesota Stormwater Manual. MPCA anticipates updating this information in the near future.