(Created page with " <center>'''This table shows Cost components for stormwater ponds'''</center> (Link to this table)<br> <table class="sortable" border...")
 
m
Line 21: Line 21:
 
<td>Salvage cost ($/acre) x Affected Area (acre)</td>
 
<td>Salvage cost ($/acre) x Affected Area (acre)</td>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td>Clearing & grubbing</td>
 
<td>Clearing & grubbing</td>
 
<td>Clearing Cost ($/acre) x Affected Area (acre)</td>
 
<td>Clearing Cost ($/acre) x Affected Area (acre)</td>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td rowspan=2>Site Formation</td>
 
<td rowspan=2>Site Formation</td>
Line 36: Line 38:
 
<td>Excavation Cost x (% of Material to be hauled away)</td>
 
<td>Excavation Cost x (% of Material to be hauled away)</td>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td rowspan=2>Structural Components</td>
 
<td rowspan=2>Structural Components</td>
Line 42: Line 45:
 
<td rowspan=2>Pipes, catchbasins, manholes, valves</td>
 
<td rowspan=2>Pipes, catchbasins, manholes, valves</td>
 
</tr>
 
</tr>
 +
 
<tr>
 
<tr>
 
<td>Outlet structure</td>
 
<td>Outlet structure</td>

Revision as of 21:05, 15 February 2013

This table shows Cost components for stormwater ponds

(Link to this table)

Implementation Stage Primary Cost Components Basic Cost Estimate Other Considerations
Site Preparation Tree & plant protection Protection Cost ($/acre) x Affected Area (acre) Removal of existing structures, topsoil removal and stockpiling
Topsoil salvage Salvage cost ($/acre) x Affected Area (acre)
Clearing & grubbing Clearing Cost ($/acre) x Affected Area (acre)
Site Formation Excavation / grading 8-ft Depth Excavation Cost ($/acre) x Area (acre) Soil & rock fill material, tunneling
Hauling material offsite Excavation Cost x (% of Material to be hauled away)
Structural Components Inlet structure ($/structure) Pipes, catchbasins, manholes, valves
Outlet structure ($/structure)
Site Restoration Seeding or sodding Seeding Cost ($/acre) x Seeded Area (acre) Tree protection, soil amendments, seed bed preparation, trails
Annual Operation, Maintenance, and Inspection Debris removal Removal Cost ($/acre) x Area (acre) x Frequency (2 / 1yr) Vegetation maintenance, cleaning of structures
Sediment removal Removal Cost ($/acre) x Area (acre) x Frequency (1 / 5yr)
Gate / valve operation Operation Cost ($) x Operation Frequency (2 / 1 yr)
Inspection
Mowing Mowing Cost ($) x Mowing Frequency (4 / 1 yr)