Line 16: Line 16:
 
:'''Practice Designer''':
 
:'''Practice Designer''':
 
===Design Considerations===
 
===Design Considerations===
 +
:'''Design Cost''':
 +
 +
:'''Design Year''':
 +
Narrative description of contributing drainage area, including description of land use
 +
 +
List of existing impairments and TMDLs that the BMP drains to
 
:'''Total Contributing Drainage Area''' (acres):
 
:'''Total Contributing Drainage Area''' (acres):
  
Line 23: Line 29:
  
 
:'''Downstream Structural Best Management Practice''':
 
:'''Downstream Structural Best Management Practice''':
:Narrative description of contributing drainage area, including description of land use
 
  
:List of existing impairments and TMDLs that the BMP drains to
+
:'''Design Pollutant Removal Performance''':
 +
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
 +
 
 +
Description of sizing criteria used to design pretreatment practice
 +
===Construction Considerations===
 +
:'''Construction Cost''':
 +
 
 +
:'''Construction Year''':
 +
Description of adverse site conditions/other construction challenges encountered during installation
 +
===Maintenance Considerations===
 +
List or description of types of maintenance practices used for the upkeep of the pretreatment system
 +
:'''Maintenance Frequency''':
 +
 
 +
:'''Maintenance Cost''':
 +
 
 +
:'''Disposal Cost''':
 +
Description of maintenance challenges, discussion of ease of maintenance
 +
 
 +
Discussion of any additional maintenance considerations
 +
===Results===
 +
:'''Measured or Estimated Pollutant Removal Performance''':
 +
Discussion of how the performance was measured or estimated
 +
 
 +
For proprietary practices, did were the manufacturer claims met?
 +
 
 +
Discussion of lessons learned through the implementation of this pretreatment practice

Revision as of 19:09, 25 January 2019

This site is currently undergoing revision. For more information, open this link.
This page is in development

Project Name

Project Overview

Narrative description of pretreatment project

Project Location:
Year Constructed:
Type of Pretreatment Practice: (e.g., forebay, proprietary settling device, etc.)
Specific Practice: (e.g., rock inlet, name of proprietary device)
Practice Owner:
Practice Designer:

Design Considerations

Design Cost:
Design Year:

Narrative description of contributing drainage area, including description of land use

List of existing impairments and TMDLs that the BMP drains to

Total Contributing Drainage Area (acres):
Total Impervious Area (acres):
Watershed Slope (%):
Downstream Structural Best Management Practice:
Design Pollutant Removal Performance:

Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)

Description of sizing criteria used to design pretreatment practice

Construction Considerations

Construction Cost:
Construction Year:

Description of adverse site conditions/other construction challenges encountered during installation

Maintenance Considerations

List or description of types of maintenance practices used for the upkeep of the pretreatment system

Maintenance Frequency:
Maintenance Cost:
Disposal Cost:

Description of maintenance challenges, discussion of ease of maintenance

Discussion of any additional maintenance considerations

Results

Measured or Estimated Pollutant Removal Performance:

Discussion of how the performance was measured or estimated

For proprietary practices, did were the manufacturer claims met?

Discussion of lessons learned through the implementation of this pretreatment practice