Line 5: | Line 5: | ||
Narrative description of pretreatment project | Narrative description of pretreatment project | ||
:'''Project Location''': | :'''Project Location''': | ||
− | |||
:'''Year Constructed''': | :'''Year Constructed''': | ||
− | |||
:'''Type of Pretreatment Practice''': (e.g., forebay, proprietary settling device, etc.) | :'''Type of Pretreatment Practice''': (e.g., forebay, proprietary settling device, etc.) | ||
− | |||
:'''Specific Practice''': (e.g., rock inlet, name of proprietary device) | :'''Specific Practice''': (e.g., rock inlet, name of proprietary device) | ||
− | |||
:'''Practice Owner''': | :'''Practice Owner''': | ||
− | |||
:'''Practice Designer''': | :'''Practice Designer''': | ||
===Design Considerations=== | ===Design Considerations=== | ||
:'''Design Cost''': | :'''Design Cost''': | ||
− | |||
:'''Design Year''': | :'''Design Year''': | ||
Narrative description of contributing drainage area, including description of land use | Narrative description of contributing drainage area, including description of land use | ||
Line 23: | Line 17: | ||
List of existing impairments and TMDLs that the BMP drains to | List of existing impairments and TMDLs that the BMP drains to | ||
:'''Total Contributing Drainage Area''' (acres): | :'''Total Contributing Drainage Area''' (acres): | ||
− | |||
:'''Total Impervious Area''' (acres): | :'''Total Impervious Area''' (acres): | ||
− | |||
:'''Watershed Slope''' (%): | :'''Watershed Slope''' (%): | ||
− | |||
:'''Downstream Structural Best Management Practice''': | :'''Downstream Structural Best Management Practice''': | ||
− | |||
:'''Design Pollutant Removal Performance''': | :'''Design Pollutant Removal Performance''': | ||
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.) | Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.) | ||
Line 36: | Line 26: | ||
===Construction Considerations=== | ===Construction Considerations=== | ||
:'''Construction Cost''': | :'''Construction Cost''': | ||
− | |||
:'''Construction Year''': | :'''Construction Year''': | ||
Description of adverse site conditions/other construction challenges encountered during installation | Description of adverse site conditions/other construction challenges encountered during installation | ||
Line 42: | Line 31: | ||
List or description of types of maintenance practices used for the upkeep of the pretreatment system | List or description of types of maintenance practices used for the upkeep of the pretreatment system | ||
:'''Maintenance Frequency''': | :'''Maintenance Frequency''': | ||
− | |||
:'''Maintenance Cost''': | :'''Maintenance Cost''': | ||
− | |||
:'''Disposal Cost''': | :'''Disposal Cost''': | ||
Description of maintenance challenges, discussion of ease of maintenance | Description of maintenance challenges, discussion of ease of maintenance |
Narrative description of pretreatment project
Narrative description of contributing drainage area, including description of land use
List of existing impairments and TMDLs that the BMP drains to
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
Description of sizing criteria used to design pretreatment practice
Description of adverse site conditions/other construction challenges encountered during installation
List or description of types of maintenance practices used for the upkeep of the pretreatment system
Description of maintenance challenges, discussion of ease of maintenance
Discussion of any additional maintenance considerations
Discussion of how the performance was measured or estimated
For proprietary practices, did were the manufacturer claims met?
Discussion of lessons learned through the implementation of this pretreatment practice