m |
|||
Line 83: | Line 83: | ||
Discussion of how the performance was measured or estimated | Discussion of how the performance was measured or estimated | ||
:'''Measured or Estimated Pollutant Removal Performance''': 2,768 lbs of material captured by the pretreatment device, including: | :'''Measured or Estimated Pollutant Removal Performance''': 2,768 lbs of material captured by the pretreatment device, including: | ||
− | *0.526 lbs phosphorus | + | :*0.526 lbs phosphorus |
− | *Significant heavy metals | + | :*Significant heavy metals |
For proprietary practices, did were the manufacturer claims met? | For proprietary practices, did were the manufacturer claims met? | ||
Discussion of lessons learned through the implementation of this pretreatment practice | Discussion of lessons learned through the implementation of this pretreatment practice |
Narrative description of pretreatment project
Narrative description of contributing drainage area, including description of land use
List of existing impairments and TMDLs that the BMP drains to
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
Description of sizing criteria used to design pretreatment practice
Description of adverse site conditions/other construction challenges encountered during installation
List or description of types of maintenance practices used for the upkeep of the pretreatment system
Description of maintenance challenges, discussion of ease of maintenance
Discussion of any additional maintenance considerations
Discussion of how the performance was measured or estimated
For proprietary practices, did were the manufacturer claims met?
Discussion of lessons learned through the implementation of this pretreatment practice
Narrative description of pretreatment project
The total contributing drainage area to the Preserver was 242 acres, with 8 acres of direct drainage area. An estimated 30% of the direct drainage area to the Preserver was impervious (2.4 acres). The land use of the contributing drainage area was residential, with a mature tree canopy.
List of existing impairments and TMDLs that the BMP drains to
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
Description of sizing criteria used to design pretreatment practice
Description of adverse site conditions/other construction challenges encountered during installation
List or description of types of maintenance practices used for the upkeep of the pretreatment system
The mature tree canopy in the contributing drainage area contributed to heavy organic loads, including large debris. The total captured material would likely be greater with more frequent cleaning of the system - the sump was full approximately halfway through the monitoring period.
Discussion of any additional maintenance considerations
Discussion of how the performance was measured or estimated
For proprietary practices, did were the manufacturer claims met?
Discussion of lessons learned through the implementation of this pretreatment practice