Line 1: | Line 1: | ||
<font size=3>'''Expected performance for temporary/permanent sediment traps and basins'''.</font size><br> | <font size=3>'''Expected performance for temporary/permanent sediment traps and basins'''.</font size><br> | ||
− | Link to this [[Expected performance for temporary/permanent sediment traps and basins |table]] | + | Link to this [[Expected performance for temporary/permanent sediment traps and basins|table]] |
<table class="sortable"> | <table class="sortable"> |
Expected performance for temporary/permanent sediment traps and basins.
Link to this table
Water quantity | |
---|---|
Flow attenuation | Secondary design benefit |
Runoff volume reduction | Secondary design benefit |
Pollution prevention | |
Erosion prevention | Little or no design benefit |
Sediment control | Primary design benefit |
Nutrient loading | Secondary design benefit |
Pollutant removal | |
Total suspended solids | Primary design benefit |
Total phosphorus | Secondary design benefit |
Heavy metals | Secondary design benefit |
Floatables | Secondary design benefit |
Oil and grease | Secondary design benefit |