m
 
Line 2: Line 2:
  
 
In this sediment basin, silt fencing has been installed to create baffles and increase flow path length to provide greater sediment removal efficiency. The perforated pipe outlet (left) has been encased in #57 stone to further slow the discharge rate, thereby increasing settling time. Note higher sediment accumulations in basin cells at right, versus those on the left. (Source: Tetra Tech)
 
In this sediment basin, silt fencing has been installed to create baffles and increase flow path length to provide greater sediment removal efficiency. The perforated pipe outlet (left) has been encased in #57 stone to further slow the discharge rate, thereby increasing settling time. Note higher sediment accumulations in basin cells at right, versus those on the left. (Source: Tetra Tech)
 +
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Images/Sediment control photos]]

Latest revision as of 16:32, 19 December 2022


In this sediment basin, silt fencing has been installed to create baffles and increase flow path length to provide greater sediment removal efficiency. The perforated pipe outlet (left) has been encased in #57 stone to further slow the discharge rate, thereby increasing settling time. Note higher sediment accumulations in basin cells at right, versus those on the left. (Source: Tetra Tech)

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current13:53, 29 January 2019Thumbnail for version as of 13:53, 29 January 20191,008 × 669 (364 KB)ZKolsum (talk | contribs)

This page was last edited on 19 December 2022, at 16:32.