(Created page with " <center><font size=3>'''This table is a stormwater wetland cost estimate worksheet.'''</font size><br> Link to this table</cent...") |
m |
||
Line 1: | Line 1: | ||
− | |||
<center><font size=3>'''This table is a stormwater wetland cost estimate worksheet.'''</font size><br> | <center><font size=3>'''This table is a stormwater wetland cost estimate worksheet.'''</font size><br> | ||
Link to this [[Stormwater wetland cost estimate worksheet|table]]</center> | Link to this [[Stormwater wetland cost estimate worksheet|table]]</center> | ||
Line 8: | Line 7: | ||
<tr> | <tr> | ||
<td>Project Title</td> | <td>Project Title</td> | ||
− | <td colspan=4> | + | <td colspan=4> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Owner</td> | <td>Owner</td> | ||
− | <td colspan=4> | + | <td colspan=4> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Location</td> | <td>Location</td> | ||
− | <td colspan=4> | + | <td colspan=4> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Project Number</td> | <td>Project Number</td> | ||
− | <td colspan=4> | + | <td colspan=4> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Date</td> | <td>Date</td> | ||
− | <td colspan=4> | + | <td colspan=4> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 40: | Line 39: | ||
<td>Tree removal - up to 12" diameter</td> | <td>Tree removal - up to 12" diameter</td> | ||
<td>each</td> | <td>each</td> | ||
− | <td> | + | <td> </td> |
<td>$350.00</td> | <td>$350.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 47: | Line 46: | ||
<td>Clear and grub brush</td> | <td>Clear and grub brush</td> | ||
<td>square yard</td> | <td>square yard</td> | ||
− | <td> | + | <td> </td> |
<td>$1.50</td> | <td>$1.50</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 54: | Line 53: | ||
<td>Tree protection - temp. fence</td> | <td>Tree protection - temp. fence</td> | ||
<td>lineal foot</td> | <td>lineal foot</td> | ||
− | <td> | + | <td> </td> |
<td>$3.00</td> | <td>$3.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 61: | Line 60: | ||
<td>Topsoil - 6" depth, salvage on site</td> | <td>Topsoil - 6" depth, salvage on site</td> | ||
<td>square yard</td> | <td>square yard</td> | ||
− | <td> | + | <td> </td> |
<td>$4.50</td> | <td>$4.50</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 73: | Line 72: | ||
<td>Excavation - deepwater zone - 4' average depth</td> | <td>Excavation - deepwater zone - 4' average depth</td> | ||
<td>square yard</td> | <td>square yard</td> | ||
− | <td> | + | <td> </td> |
<td>$5.00</td> | <td>$5.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 80: | Line 79: | ||
<td>Excavation - marsh zone - 1' average depth</td> | <td>Excavation - marsh zone - 1' average depth</td> | ||
<td>square yard</td> | <td>square yard</td> | ||
− | <td> | + | <td> </td> |
<td>$1.00</td> | <td>$1.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 87: | Line 86: | ||
<td>Grading</td> | <td>Grading</td> | ||
<td>square yard</td> | <td>square yard</td> | ||
− | <td> | + | <td> </td> |
<td>$1.50</td> | <td>$1.50</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 94: | Line 93: | ||
<td>Hauling off-site - 5' depth</td> | <td>Hauling off-site - 5' depth</td> | ||
<td>square yard</td> | <td>square yard</td> | ||
− | <td> | + | <td> </td> |
<td>$5.00</td> | <td>$5.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 105: | Line 104: | ||
<td>Inlet structure</td> | <td>Inlet structure</td> | ||
<td>each</td> | <td>each</td> | ||
− | <td> | + | <td> </td> |
<td>$2,000.00</td> | <td>$2,000.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 112: | Line 111: | ||
<td>Outlet structure</td> | <td>Outlet structure</td> | ||
<td>each</td> | <td>each</td> | ||
− | <td> | + | <td> </td> |
<td>$3,500.00</td> | <td>$3,500.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 123: | Line 122: | ||
<td>Sod - above vegetative bench</td> | <td>Sod - above vegetative bench</td> | ||
<td>square yard</td> | <td>square yard</td> | ||
− | <td> | + | <td> </td> |
<td>$4.50</td> | <td>$4.50</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 131: | Line 130: | ||
<td>Soil preparation</td> | <td>Soil preparation</td> | ||
<td>square yard</td> | <td>square yard</td> | ||
− | <td> | + | <td> </td> |
<td>$25.00</td> | <td>$25.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 138: | Line 137: | ||
<td>Seeding - vegetative bench</td> | <td>Seeding - vegetative bench</td> | ||
<td>square yard</td> | <td>square yard</td> | ||
− | <td> | + | <td> </td> |
<td>$0.50</td> | <td>$0.50</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 145: | Line 144: | ||
<td>Planting</td> | <td>Planting</td> | ||
<td>square yard</td> | <td>square yard</td> | ||
− | <td> | + | <td> </td> |
<td>$30.00</td> | <td>$30.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 166: | Line 165: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | + | <hr> | |
<tr> | <tr> | ||
<td> colspan=4><p akign="right">TAL CONSTRUCTION COST</p> </td> | <td> colspan=4><p akign="right">TAL CONSTRUCTION COST</p> </td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<br> | <br> | ||
− | + | <hr> | |
− | |||
<tr> | <tr> | ||
<td colspan=5>'''Annual Operation and Maintenance'''</td> | <td colspan=5>'''Annual Operation and Maintenance'''</td> | ||
Line 182: | Line 179: | ||
<td>Debris removal</td> | <td>Debris removal</td> | ||
<td>per visit</td> | <td>per visit</td> | ||
− | <td> | + | <td> </td> |
<td>$100.00</td> | <td>$100.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 189: | Line 186: | ||
<td>Remove invasive plants</td> | <td>Remove invasive plants</td> | ||
<td>per visit</td> | <td>per visit</td> | ||
− | <td> | + | <td> </td> |
<td>$500.00</td> | <td>$500.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 196: | Line 193: | ||
<td>Replant wetland vegetation</td> | <td>Replant wetland vegetation</td> | ||
<td>per plant</td> | <td>per plant</td> | ||
− | <td> | + | <td> </td> |
<td>$10.00</td> | <td>$10.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 204: | Line 201: | ||
<td>Repair erosion</td> | <td>Repair erosion</td> | ||
<td>square yard</td> | <td>square yard</td> | ||
− | <td> | + | <td> </td> |
<td>$75.00</td> | <td>$75.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 212: | Line 209: | ||
<td>Sediment removal and disposal</td> | <td>Sediment removal and disposal</td> | ||
<td>cubic yard</td> | <td>cubic yard</td> | ||
− | <td> | + | <td> </td> |
<td>$10.00</td> | <td>$10.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 220: | Line 217: | ||
<td>Mow</td> | <td>Mow</td> | ||
<td>per visit</td> | <td>per visit</td> | ||
− | <td> | + | <td> </td> |
<td>$150.00</td> | <td>$150.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 228: | Line 225: | ||
<td>Gate / valve operation</td> | <td>Gate / valve operation</td> | ||
<td>per visit</td> | <td>per visit</td> | ||
− | <td> | + | <td> </td> |
<td>$125.00</td> | <td>$125.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 236: | Line 233: | ||
<td>Inspection</td> | <td>Inspection</td> | ||
<td>per visit</td> | <td>per visit</td> | ||
− | <td> | + | <td> </td> |
<td>$125.00</td> | <td>$125.00</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
Line 249: | Line 246: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | + | <hr> | |
<tr> | <tr> | ||
<td> colspan=4><p akign="right">TOTAL ANNUAL O&M COST</p> </td> | <td> colspan=4><p akign="right">TOTAL ANNUAL O&M COST</p> </td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | + | <hr> | |
− | |||
<tr> | <tr> | ||
<td colspan=5>'''Minnesota Location Factors'''</td> | <td colspan=5>'''Minnesota Location Factors'''</td> | ||
Line 325: | Line 321: | ||
<td colspan=3>0.935</td> | <td colspan=3>0.935</td> | ||
</tr> | </tr> | ||
− | + | ||
− | |||
− | |||
<p>Note: Suggested unit costs are based on RSMeans prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation</p> | <p>Note: Suggested unit costs are based on RSMeans prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation</p> | ||
− | + | ||
</table> | </table> |
Note: Suggested unit costs are based on RSMeans prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation
Project Title | ||||
Owner | ||||
Location | ||||
Project Number | ||||
Date | ||||
Description | Units | Quantity | Unit Cost | Total Estimated Price |
---|---|---|---|---|
Site Preparation | ||||
Tree removal - up to 12" diameter | each | $350.00 | $0.00 | |
Clear and grub brush | square yard | $1.50 | $0.00 | |
Tree protection - temp. fence | lineal foot | $3.00 | $0.00 | |
Topsoil - 6" depth, salvage on site | square yard | $4.50 | $0.00 | |
Site Formation | ||||
Excavation - deepwater zone - 4' average depth | square yard | $5.00 | $0.00 | |
Excavation - marsh zone - 1' average depth | square yard | $1.00 | $0.00 | |
Grading | square yard | $1.50 | $0.00 | |
Hauling off-site - 5' depth | square yard | $5.00 | $0.00 | |
Structural Components | ||||
Inlet structure | each | $2,000.00 | $0.00 | |
Outlet structure | each | $3,500.00 | $0.00 | |
Site Restoration | ||||
Sod - above vegetative bench | square yard | $4.50 | $0.00 | |
Soil preparation | square yard | $25.00 | $0.00 | |
Seeding - vegetative bench | square yard | $0.50 | $0.00 | |
Planting | square yard | $30.00 | $0.00 | |
colspan=4> Subtotal |
$0.00 | |||
colspan=4> 10% Contingencies |
$0.00 | |||
colspan=4> Subtotal |
$0.00 | |||
colspan=4> Apply MN Location Factor |
$0.00 | |||
colspan=4> TAL CONSTRUCTION COST |
$0.00 | |||
Annual Operation and Maintenance | ||||
Debris removal | per visit | $100.00 | $0.00 | |
Remove invasive plants | per visit | $500.00 | $0.00 | |
Replant wetland vegetation | per plant | $10.00 | $0.00 | |
Repair erosion | square yard | $75.00 | $0.00 | |
Sediment removal and disposal | cubic yard | $10.00 | $0.00 | |
Mow | per visit | $150.00 | $0.00 | |
Gate / valve operation | per visit | $125.00 | $0.00 | |
Inspection | per visit | $125.00 | $0.00 | |
colspan=4> Subtotal |
$0.00 | |||
colspan=4> Apply MN Location Factor |
$0.00 | |||
colspan=4> TOTAL ANNUAL O&M COST |
$0.00 | |||
Minnesota Location Factors | ||||
Bemidji | 0.963 | |||
Brainerd | 1.003 | |||
Detroit Lakes | 0.962 | |||
Duluth | 0.991 | |||
Mankato | 0.990 | |||
Bemidji | 0.963 | |||
Minneapolis | 1.035 | |||
Rochester | 0.983 | |||
St. Paul | 1.000 | |||
St. Cloud | 1.002 | |||
Thief River Falls | 1.042 | |||
Willmar | 0.961 | |||
Windom | 0.935 |