m
 
Line 1: Line 1:
 
Soil dug from a trench is placed a long the edge of the construction site as a berm to be used as a form of secondary containment to the silt fence rather than left in a stockpile on-site.
 
Soil dug from a trench is placed a long the edge of the construction site as a berm to be used as a form of secondary containment to the silt fence rather than left in a stockpile on-site.
 +
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Images/Sediment control photos]]

Latest revision as of 16:53, 19 December 2022

Soil dug from a trench is placed a long the edge of the construction site as a berm to be used as a form of secondary containment to the silt fence rather than left in a stockpile on-site.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current17:53, 18 April 2019Thumbnail for version as of 17:53, 18 April 20193,996 × 2,528 (2.95 MB)ZKolsum (talk | contribs)

The following page uses this file:

Metadata

This page was last edited on 19 December 2022, at 16:53.