|
|
Line 156: |
Line 156: |
| *spillway | | *spillway |
| *steep slopes | | *steep slopes |
− | *<span title="A catch basin is a structure made of precast concrete with a sump* that allows solids, trash and debris to settle out to the bottom of the basin, below an outlet pipe that allows water to flow out of the structure"> '''sump manhole'''</span> | + | *<span title="A catch basin is a structure made of precast concrete with a sump that allows solids, trash and debris to settle out to the bottom of the basin, below an outlet pipe that allows water to flow out of the structure"> '''sump manhole'''</span> |
| *<span title="Stormwater pollution prevention plan."> '''SWPPP'''</span> | | *<span title="Stormwater pollution prevention plan."> '''SWPPP'''</span> |
| | | |
Revision as of 13:09, 29 May 2019
This page lists standard definitions used in hover boxes throughout this manual. Hover boxes allow the user to hover over bolded text and see a definition for that text.
A
B
- baffle
- bank stabilization
- biofiltration
- best management practice
- bioinfiltration
- bioretention practice
- Bioswale
- Brushing
- buffer zones.
- bypass flow
C
- clay
- coagulation
- coarse sediment
- collector roadway
- concentrated flow
- concentrated stormwater runoff
- conventional roof
- curb-cut
- curb bump-out
D
E
F
- filter fabric
- filter strip
- flash
- flocculant
- flocculation
- flow paths
- fluvial systems
- footprint
- forebay
- fractured flow
G
- grade
- grade control structures
- green roof
- green space
- geotextile
H
- herbaceous perennial
- highly urban and ultra-urban environments
- hydraulic conductivity of the aquifer material (k),
- hydraulic grade line
- hydraulic gradient (i),
- hydraulic model
- hydrogeology
I
J
K
L
- level spreader
- live storage
- longitudinal slope
- low permeability soils
M
- media
- mesic
- moderate to steep slopes
- mulching
N
O
P
- perimeter control
- permanent cover
- permanent stormwater management
- plugs
- point of discharge
- polymer
- porosity (f)
- Portland cement concrete
- Prairie du Chien formation,
- Prescribed burning
- pretreatment
- proprietary structures
Q
R
- riprap
- riprap
- rock armored
- rock riffle
S
T
- travel time
- treatment train
- turbid
- two-stage channel
U
- highly urban and ultra-urban environments
- underdrain
V
W
X
Y
Z