m
m
Line 54: Line 54:
  
 
<noinclude>
 
<noinclude>
[[category:Sediment control table]]
+
[[Category:Level 3 - Category:Level 3 - General information, reference, tables, images, and archives/Tables/Sediment control]]
 
</noinclude>
 
</noinclude>

Revision as of 11:18, 24 July 2022

Expected performance for storm drain inlet protection
Link to this table

Water Quantity
Flow attenuation Little or no design benefit
Runoff volume reduction Little or no design benefit
Water Quantity
Pollution prevention
Soil erosion Little or no design benefit
Sediment control Primary design benefit
Nutrient loading Secondary design benefit
Pollutant removal
Total suspended solids Primary design benefit
Total phosphorus Secondary design benefit
Heavy metals Secondary design benefit
Floatables Little or no design benefit
Oil and grease Little or no design benefit