==Appendix B. Schedules== | ==Appendix B. Schedules== | ||
===<span style="color: black">'''Table 2:<br/>Existing Permittees - Schedule of permit requirements'''=== | ===<span style="color: black">'''Table 2:<br/>Existing Permittees - Schedule of permit requirements'''=== | ||
+ | {| class="wikitable" style = "background: transparent;" | ||
+ | |- | ||
+ | ! style="text-align: left; background: transparent;"|'''<i>Permit requirement</i>''' !! style="text-align: left; background: transparent;"|'''<i>Schedule</i>''' | ||
+ | |- | ||
+ | | '''Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document''' | ||
+ | *<i>Submit the SWPPP Document completed in accordance withn<br/>Section 12<i/> | ||
+ | | | ||
+ | *Within 150 days after General Permit issuance<br/>date. | ||
+ | |- | ||
+ | | '''Section 13. Stormwater Pollution Prevention Program (SWPPP)''' | ||
+ | *<i>Complete revisions to incorporate the new requirements of<br/>Sections 14 - 23 into current SWPPP.<i/> | ||
+ | | | ||
+ | *Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below. | ||
+ | |- | ||
+ | |'''Section 19. Construction Site Stormwater Runoff Control''' | ||
+ | *<i>Complete revisions to Construction Site Stormwater Runoff<br/>Control program, including revisions to regulatory mechanism(s),<br/>if necessary | ||
+ | *When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit.<i/> | ||
+ | | | ||
+ | *Within 12 months of the date General Permit<br/>coverage is extended | ||
+ | *Within 12 months of the issuance date of the CSW<br/>Permit (expected issuance date of the CSW Permit<br/>is August 1, 2023). | ||
+ | |- | ||
+ | |'''Section 21. Pollution Prevention/Good Housekeeping for<br/>Municipal Operations''' | ||
+ | *<i>Conduct structural stormwater best management practice (BMP)<br/>inspections. | ||
+ | *Conduct pond and outfall inspections.<i/> | ||
+ | | | ||
+ | *Each calendar year. | ||
+ | *Prior to the expiration date of the General Permit. | ||
+ | |- | ||
+ | | '''Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA''' | ||
+ | *<i>Submit all information required in item 22.2. | ||
+ | *Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22. <i/> | ||
+ | | | ||
+ | *With each annual report. | ||
+ | *Within 12 months of the date General Permit<br/>coverage is extended. | ||
+ | |- | ||
+ | | '''Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping''' | ||
+ | *<i>Conduct assessment of the SWPPP. | ||
+ | *On a form provided by the Agency, submit an annual report<i/> | ||
+ | | | ||
+ | *Prior to completion of each annual report. | ||
+ | *By June 30<sup>th</sup> of each calendar year. | ||
+ | |} | ||
+ | |||
+ | ===<span style="color: black">'''Table 3:<br/>New Permittees - Schedule of permit requirements'''=== | ||
{| class="wikitable" style = "background: transparent;" | {| class="wikitable" style = "background: transparent;" | ||
|- | |- | ||
Line 60: | Line 104: | ||
*<i>Conduct assessment of the SWPPP.<i/> | *<i>Conduct assessment of the SWPPP.<i/> | ||
*On a form provided by the Agency, submit an annual report.<i/> | *On a form provided by the Agency, submit an annual report.<i/> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| | | | ||
*Prior to completion of each annual report. | *Prior to completion of each annual report. | ||
*By June 30<sup>th</sup> of each calendar year. | *By June 30<sup>th</sup> of each calendar year. | ||
|} | |} |
Permit requirement | Schedule |
---|---|
Section 12. Stormwater Pollution Prevention Program (SWPPP) Document
|
|
Section 13. Stormwater Pollution Prevention Program (SWPPP)
|
|
Section 19. Construction Site Stormwater Runoff Control
|
|
Section 21. Pollution Prevention/Good Housekeeping for Municipal Operations
|
|
Section 22. Discharges to Impaired Waters with a USEPA- Approved TMDL that includes an Applicable WLA
|
|
Section 25. Annual Assessment, Annual Reporting, and Recordkeeping
|
|
Permit requirement | Schedule |
---|---|
Section 10. New Permittee Applicants
|
|
Section 13. Stormwater Pollution Prevention Program (SWPPP)
|
|
Section 14. Mapping
|
|
Section 18. Illicit Discharge Detection and Elimination
|
|
Section 19. Construction Site Stormwater Runoff Control
|
|
Section 20. Post-Construction Stormwater Management
|
|
Section 21. Pollution Prevention/Good Housekeeping for Municipal Operations
|
|
Section 22. Discharges to Impaired Waters with a USEPA- Approved TMDL that includes an Applicable WLA
|
|
Section 23. Alum or Ferric Chloride Phosphorus Treatment Systems (if applicable)
|
|
Section 25. Annual SWPPP Assessment, Annual Reporting, and Recordkeeping
|
|