Tag: Blanking
Line 1: Line 1:
==Appendix B. Schedules==
 
  
===<span style="color: black">'''Table 2:<br/>Existing Permittees - Schedule of permit requirements'''===
 
 
{| class="wikitable" style = "background: transparent;"
 
|-
 
! style="text-align: left; background: transparent;"|'''<i>Permit requirement</i>''' !! style="text-align: left; background: transparent;"|'''<i>Schedule</i>'''
 
|-
 
| '''Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document'''
 
*<i>Submit the SWPPP Document completed in accordance withn<br/>Section 12</i>
 
|
 
*Within 150 days after General Permit issuance<br/>date.
 
|-
 
| '''Section 13. Stormwater Pollution Prevention Program (SWPPP)'''
 
*<i>Complete revisions to incorporate the new requirements of<br/>Sections 14 - 23 into current SWPPP.</i>
 
|
 
*Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below.
 
|-
 
|'''Section 19. Construction Site Stormwater Runoff Control'''
 
*<i>Complete revisions to Construction Site Stormwater Runoff<br/>Control program, including revisions to regulatory mechanism(s),<br/>if necessary
 
*When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit.</i>
 
|
 
*Within 12 months of the date General Permit<br/>coverage is extended
 
*Within 12 months of the issuance date of the CSW<br/>Permit (expected issuance date of the CSW Permit<br/>is August 1, 2023).
 
|-
 
|'''Section 21. Pollution Prevention/Good Housekeeping for<br/>Municipal Operations'''
 
*<i>Conduct structural stormwater best management practice (BMP)<br/>inspections.
 
*Conduct pond and outfall inspections.</i>
 
|
 
*Each calendar year.
 
*Prior to the expiration date of the General Permit.
 
|-
 
| '''Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA'''
 
*<i>Submit all information required in item 22.2.
 
*Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22.</i>
 
|
 
*With each annual report.
 
*Within 12 months of the date General Permit<br/>coverage is extended.
 
|-
 
|'''Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping'''
 
*<i>Conduct assessment of the SWPPP.
 
*On a form provided by the Agency, submit an annual report</i>
 
|
 
*Prior to completion of each annual report.
 
*By June 30<sup>th</sup> of each calendar year.
 
|}
 
 
===<span style="color: black">'''Table 3:<br/>New Permittees - Schedule of permit requirements'''===
 
{| class="wikitable" style = "background: transparent;"
 
|-
 
! style="text-align: left; background: transparent;"|'''<i>Permit requirement</i>''' !! style="text-align: left; background: transparent;"|'''<i>Schedule</i>'''
 
|-
 
|'''Section 10. New Permittee Applicants'''
 
*<i>Submit Part 1, and Part 2 of the permit application as required<br/>by Section 12<i/>
 
|
 
*Within 18 months of written notification from the<br/>Commissioner that the MS4 meets the criteria in Minn.<br/>R. 7090.1010, subp. 1.A. or B. and General Permit coverage is<br/>required.
 
|-
 
|'''Section 13. Stormwater Pollution Prevention Program (SWPPP)'''
 
*<i>Complete all requirements of Sections 14 - 23. <i/>
 
|
 
*Within 36 months of the date General Permit coverage is<br/>extended, unless other timelines have been specifically<br/>established in the General Permit and identified below; or
 
*Within timelines established by the Commissioner in item 8.3.
 
|-
 
|'''Section 14. Mapping'''
 
*<i>Develop a storm sewer system map.<i/>
 
|
 
*Within 24 months of the date General Permit<br/>coverage is extended.
 
|-
 
|'''Section 18. Illicit Discharge Detection and Elimination'''
 
*<i>Develop, implement, and enforce an Illicit Discharge Detection<br/>and Elimination Program.<i/>
 
|
 
*Within 12 months of the date General Permit<br/>coverage is extended.
 
|-
 
|'''Section 19. Construction Site Stormwater Runoff Control'''
 
*<i>Develop, implement, and enforce a Construction Site<br/>Stormwater Runoff Control Program.
 
*When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls<br/>described in the CSW Permit. <i/>
 
|
 
*Within 12 months of the date General Permit<br/>coverage is extended.
 
*Within 12 months of the issuance date of the CSW Permit<br/>(expected issuance date of the CSW Permit is August 1, 2023).
 
|-
 
|'''Section 20. Post-Construction Stormwater Management'''
 
*<i>Develop, implement, and enforce a Post-Construction<br/>Stormwater Management program.<i/>
 
|
 
*Within 24 months of the date General Permit<br/>coverage is extended.
 
|-
 
|'''Section 21. Pollution Prevention/Good Housekeeping for<br/>Municipal Operations'''
 
*<i>Conduct structural stormwater BMP inspections.
 
*Conduct pond and outfall inspections.<i/>
 
|
 
*Each calendar year.
 
*Prior to the expiration date of the General Permit.
 
|-
 
|'''Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA'''
 
*<i>Submit all information required in item 22.2.
 
*Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22.<i/>
 
|
 
*With each annual report.
 
*Within 12 months of the date General Permit<br/>coverage is extended.
 
|-
 
|'''Section 23. Alum or Ferric Chloride Phosphorus Treatment<br/>Systems (if applicable)'''
 
*<i>Meet requirements for treatment systems in Section 23.<i/>
 
|
 
*Within 12 months of the date General Permit<br/>coverage is extended.
 
|-
 
|'''Section 25. Annual SWPPP Assessment, Annual Reporting, and<br/>Recordkeeping'''
 
*<i>Conduct assessment of the SWPPP.<i/>
 
*On a form provided by the Agency, submit an annual report.<i/>
 
|
 
*Prior to completion of each annual report.
 
*By June 30<sup>th</sup> of each calendar year.
 
|}
 

Revision as of 14:45, 9 December 2020