Line 11: Line 11:
 
:b. outfalls, including a unique identification (ID) number assigned by the permittee, and an associated geographic coordinates;
 
:b. outfalls, including a unique identification (ID) number assigned by the permittee, and an associated geographic coordinates;
  
:c. structural stormwater BMPs that are part of the permittee's MS4; and
+
:c. structural stormwater [https://stormwater.pca.state.mn.us/index.php?title=2020_MS4_General_Permit_Section_27_Definitions#27.6 BMPs] that are part of the permittee's MS4; and
  
 
:d. all receiving waters. [[https://www.revisor.mn.gov/rules/7090/ Minn. R. 7090]]</big>
 
:d. all receiving waters. [[https://www.revisor.mn.gov/rules/7090/ Minn. R. 7090]]</big>

Revision as of 16:36, 10 February 2021

Section 14 Mapping

14.1

Mapping. [Minn. R. 7090]

14.2

New permittees must develop, and existing permittees must update, as necessary, a storm sewer system map that depicts the following:

a. the permittee's entire MS4 as a goal, but at a minimum, all pipes 12 inches or greater in diameter, including stormwater flow direction in those pipes;
b. outfalls, including a unique identification (ID) number assigned by the permittee, and an associated geographic coordinates;
c. structural stormwater BMPs that are part of the permittee's MS4; and
d. all receiving waters. [Minn. R. 7090]