m
m
Line 6: Line 6:
 
<th>Annual Rainfall/Flow Rate</th>
 
<th>Annual Rainfall/Flow Rate</th>
 
<th>Total Precipitation & Rainfall Erosivity Index</th>
 
<th>Total Precipitation & Rainfall Erosivity Index</th>
<th>Application Rate For Vegetated* Compost Surface Mulch</th>
+
<th>Application Rate For Vegetated<sup>1</sup> Compost Surface Mulch</th>
 
<th>Application Rate For Unvegetated Compost Surface Mulch</th>
 
<th>Application Rate For Unvegetated Compost Surface Mulch</th>
 
</tr>
 
</tr>
Line 28: Line 28:
 
</tr>
 
</tr>
 
</table>
 
</table>
<font size=1>These lower application rates should only be used in conjunction with seeding, and for compost blankets applied during the prescribed planting season for the particular region.</font size>
+
<font size=1><sup>1</sup>These lower application rates should only be used in conjunction with seeding, and for compost blankets applied during the prescribed planting season for the particular region.</font size>
  
 
[[category:table]]
 
[[category:table]]

Revision as of 20:57, 14 March 2013

Summary of construction requirements: Compost blanket application.
Link to this table

Annual Rainfall/Flow Rate Total Precipitation & Rainfall Erosivity Index Application Rate For Vegetated1 Compost Surface Mulch Application Rate For Unvegetated Compost Surface Mulch
Low 1-25”, 20-90 ½ - ¾ ” (12.5 mm – 19 mm) 1” – 1 ½” (25 mm – 37.5mm)
Average 26-50”, 91-200 ¾ - 1” (19 mm – 25 mm) 1 ½” – 2” (37 mm – 50 mm)
High 51” and above, 201 and above 1-2” (25 mm – 50 mm) 2-4” (50mm – 100mm)

1These lower application rates should only be used in conjunction with seeding, and for compost blankets applied during the prescribed planting season for the particular region.