(Created page with "==Bioretention== *General plan: File:Bioretention CADD Details GEN PLAN (1).pdf *Infiltration filtration recharge: [[File:Bioretention CADD Details infil-filtration-rechar...")
 
Line 9: Line 9:
 
*Infiltration basin plan and profile: [[File:Infiltration Basin INFILTRATION BASIN PLAN & PROFILE (1).pdf]]
 
*Infiltration basin plan and profile: [[File:Infiltration Basin INFILTRATION BASIN PLAN & PROFILE (1).pdf]]
 
*Infiltration subsurface layout: [[File:Infiltration Subsurface Layout2 (1).pdf]]
 
*Infiltration subsurface layout: [[File:Infiltration Subsurface Layout2 (1).pdf]]
 +
 +
{{alert|Note that the following diagram for an infiltration trench shows the depth of the trench exceeding the width.  This would result in this BMP being classified as a Class V underground injection well.  It is HIGHLY RECOMMENDED that the length of the trench be a minimum of two times the depth of the BMP.|alert-danger}}
 
*Infiltration trench section: [[File:INFILTRATION TRENCH INFILTRATION TRENCH SECTION (1).pdf|INFILTRATION TRENCH INFILTRATION TRENCH SECTION (1).pdf]]
 
*Infiltration trench section: [[File:INFILTRATION TRENCH INFILTRATION TRENCH SECTION (1).pdf|INFILTRATION TRENCH INFILTRATION TRENCH SECTION (1).pdf]]
  

Revision as of 16:49, 2 July 2013

Bioretention

Infiltration

Warning: Note that the following diagram for an infiltration trench shows the depth of the trench exceeding the width. This would result in this BMP being classified as a Class V underground injection well. It is HIGHLY RECOMMENDED that the length of the trench be a minimum of two times the depth of the BMP.

Ponds

Sand filters

Swales