m |
m |
||
Line 1: | Line 1: | ||
− | <center><font size=3>'''Stormwater pond cost estimate worksheet | + | <center><font size=3>'''Stormwater pond cost estimate worksheet'''</font size><br> |
Link to this [[Stormwater pond cost estimate worksheet|table]]</center> | Link to this [[Stormwater pond cost estimate worksheet|table]]</center> | ||
Line 8: | Line 8: | ||
<td colspan=4> </td> | <td colspan=4> </td> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
<td>Owner</td> | <td>Owner</td> | ||
Line 16: | Line 17: | ||
<td colspan=4> </td> | <td colspan=4> </td> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
<td>Project Number</td> | <td>Project Number</td> | ||
<td colspan=4> </td> | <td colspan=4> </td> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
<td>Date</td> | <td>Date</td> | ||
Line 47: | Line 50: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
<td>Clear and grub brush</td> | <td>Clear and grub brush</td> | ||
Line 54: | Line 58: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
<td>Tree protection - temp. fence</td> | <td>Tree protection - temp. fence</td> | ||
Line 75: | Line 80: | ||
<th colspan=5>'''Site Formation'''</th> | <th colspan=5>'''Site Formation'''</th> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
<td>Excavation - 8' depth</td> | <td>Excavation - 8' depth</td> | ||
Line 82: | Line 88: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | + | ||
<tr> | <tr> | ||
<td>Grading</td> | <td>Grading</td> | ||
Line 90: | Line 96: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
<td>Hauling off-site - 8' depth</td> | <td>Hauling off-site - 8' depth</td> | ||
Line 162: | Line 169: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
<td colspan=4>Subtotal</td> | <td colspan=4>Subtotal</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
<td colspan=4>Apply MN Location Factor</td> | <td colspan=4>Apply MN Location Factor</td> | ||
Line 238: | Line 247: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
+ | |||
<tr> | <tr> | ||
<td>Inspection</td> | <td>Inspection</td> | ||
Line 354: | Line 364: | ||
− | [[category: | + | [[category:Table]] |
Project Title | ||||
Owner | ||||
Location | ||||
Project Number | ||||
Date | ||||
Description | Units | Quantity | Unit Cost | Total Estimated Price |
---|---|---|---|---|
Site Preparation | ||||
Tree removal - up to 12" diameter | each | $350.00 | $0.00 | |
Clear and grub brush | square yard | $1.50 | $0.00 | |
Tree protection - temp. fence | lineal foot | $3.00 | $0.00 | |
Topsoil - 6" depth, salvage on site | square yard | $4.50 | $0.00 | |
Site Formation | ||||
Excavation - 8' depth | square yard | $10.00 | $0.00 | |
Grading | square yard | $1.50 | $0.00 | |
Hauling off-site - 8' depth | square yard | $10.00 | $0.00 | |
Structural Components | ||||
Inlet structure | each | $2,000.00 | $0.00 | |
Overflow structure | each | $3,500.00 | $0.00 | |
Site Restoration | ||||
Sod - above vegetative bench | square yard | $4.50 | $0.00 | |
Soil preparation | square yard | $5.00 | $0.00 | |
Seeding - vegetative bench | square yard | $0.50 | $0.00 | |
Mulch | square yard | $2.00 | $0.00 | |
Subtotal | $0.00 | |||
10% Contingencies | $0.00 | |||
Subtotal | $0.00 | |||
Apply MN Location Factor | $0.00 | |||
TAL CONSTRUCTION COST | $0.00 | |||
Annual Operation and Maintenance | ||||
Debris removal | per visit | $100.00 | $0.00 | |
Remove invasive plants | per visit | $500.00 | $0.00 | |
Replant wetland vegetation | per plant | $10.00 | $0.00 | |
Repair erosion | square yard | $75.00 | $0.00 | |
Sediment removal and disposal | cubic yard | $10.00 | $0.00 | |
Mow | per visitt | $150.00 | $0.00 | |
Gate / valve operation | per visit | $125.00 | $0.00 | |
Inspection | per visit | $125.00 | $0.00 | |
Subtotal | $0.00 | |||
Apply MN Location Factor | $0.00 | |||
TOTAL ANNUAL O&M COST | $0.00 | |||
Minnesota Location Factors | ||||
Bemidji | 0.963 | |||
Brainerd | 1.003 | |||
Detroit Lakes | 0.962 | |||
Duluth | 0.991 | |||
Mankato | 0.990 | |||
Bemidji | 0.963 | |||
Minneapolis | 1.035 | |||
Rochester | 0.983 | |||
St. Paul | 1.000 | |||
St. Cloud | 1.002 | |||
Thief River Falls | 1.042 | |||
Willmar | 0.961 | |||
Windom | 0.935 |
Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation