m
Line 8: Line 8:
  
 
<noinclude>
 
<noinclude>
[[Category:2018 Construction Stormwater General Permit]]
+
[[Category:Level 2 - Regulatory/Construction (CSW)]]
 
</noinclude>
 
</noinclude>

Revision as of 20:44, 17 November 2022

SECTION 20 SWPPP AVAILABILITY

20.1

SWPPP Availability.

20.2

Permittees must keep the SWPPP, including all changes to it, and inspections and maintenance records at the site during normal working hours by permittees who have operational control of that portion of the site.