Line 9: | Line 9: | ||
===Guidance for completing the Annual Report form=== | ===Guidance for completing the Annual Report form=== | ||
#[[Download page with TMDL forms]] | #[[Download page with TMDL forms]] | ||
+ | #[https://app.sharebase.com/#/folder/37975/share/185-Q8EKaJdyWQ3njbQssG7MTqUv49Q Link to many TMDL shapefiles] | ||
#[[Guidance for completing the TMDL reporting form]] | #[[Guidance for completing the TMDL reporting form]] | ||
##[[Quick Guide: BMP-Activities completed tab]] | ##[[Quick Guide: BMP-Activities completed tab]] | ||
Line 15: | Line 16: | ||
#[[FAQs on TMDL reporting form]] | #[[FAQs on TMDL reporting form]] | ||
#[[Baseline year]] | #[[Baseline year]] | ||
− | |||
− | |||
===Guidance for resources and tools used to complete the Annual Report form=== | ===Guidance for resources and tools used to complete the Annual Report form=== |
MS4 (Municipal Separate Storm Sewer System) permittees who have a U.S.EPA-approved total maximum daily load wasteload allocation (WLA) that they are not meeting must annually report on progress made toward achieving those WLAs. This is achieved by submitting an annual report on a Minnesota Pollution Control Agency (MPCA) form approved by the MPCA Commissioner. This page provides links to guidance on completing that form, including links to resources and tools used to complete the form.
NOTE: Permit requirements differ for Phase 2 MS4s and the two Phase 1 cities (St. Paul and Minneapolis), so the page is divided into separate sections based on those differing requirements.