m |
m |
||
Line 52: | Line 52: | ||
<noinclude> | <noinclude> | ||
[[Category:Level 3 - Best management practices/Pretreatment practices/Tables]] | [[Category:Level 3 - Best management practices/Pretreatment practices/Tables]] | ||
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Pretreatment]] | ||
</noinclude> | </noinclude> |
Other water quality devices - installation and maintenance recommendations
Link to this table
Device | Installation notes | Frequency of inspections | Maintenance checklist (link) | Permitted on private land/ Maintenance agreement recommended | Practices for minimizing sediment and trash buildup | Cost considerations (equipment needed and man hours) |
---|---|---|---|---|---|---|
SNOUT | Monthly for the first year, then annual inspection of anti-siphon vent and access hatch. If Bio-Skirt is used, check monthly [1] | Maintenance considerations | Sediment removed from sump when it is half full. Trash and floatables removed when 6 in accumulates on surface. If Bio-Skirt is used, replace immediately after oil spill or when 2/3 of boom is submerged (nearly saturated) [2] | |||
Eliminator | Installs in minutes. Installation instructions here. [3] | After major storm events | Catch basin, hood, and filter (if used) cleaned annually [4] | |||
Floatable boom | Monthly and after major storm events | Frequent inspection and floatables removal. | ||||
Hood | Monthly and after major storm events | Frequent inspection and floatables removal. |