m |
m |
||
Line 55: | Line 55: | ||
</table> | </table> | ||
− | [[category:Table]] | + | <noinclude>[[category:Table]]</noinclude> |
Overview of unified stormwater sizing criteria
Link to this table
Target | Current State or Local Sizing Criteria |
---|---|
Recharge (Vre) or Infiltration |
Regular Waters: None required, although recharge and infiltration are strongly encouraged through better site design and stormwater credits. CGP Special Waters: Full infiltration of the excess runoff volume from the two year-24 hour storm event is one option contained in the CGP to meet the requirement for temperature control for trout streams. Other Sensitive Receiving Waters: Recharge recommended as a local option. Recharge may be restricted or prohibited in certain settings, as outlined in the Recharge and Infiltration Criterion below. |
Water Quality (Vwq) |
Regular Waters: Apply MPCA Sizing Rule 1 or 3 in 2003 GCP, depending on BMP used. CGP Special Waters: Apply MPCA Sizing Rule 2 or 4 in 2003 GCP, depending on BMP used. Additional BMPs required under CGP Appendix A (B) for special waters. Other Sensitive Receiving Waters: Recommend expanded sizing criteria for most-sensitive lakes, trout streams (in CGP), susceptible wetlands and impaired waters, as described later in this section. |
Channel Protection (Vcp) |
Regular Waters: No current state requirement. It is recommended that communities adopt a criterion for either 24-hour extended detention of the 1-year, 24-hour design storm or one-half of the 2-yr, 24-hr pre-development peak flow when revising or adopting local stormwater ordinances for peak flow control (and eliminate two-year peak discharge requirements). CGP Special Waters: One- and two-year design storm peak discharge and volume control required in four special water categories (wilderness, trout lakes, lake trout lakes, and scientific and natural areas). Other Sensitive Receiving Waters: 12-hour detention of water is recommended as the most for discharge to trout streams (to prevent heating), while other sensitive receiving waters should maintain the 24-hour minimum. |
Overbank Flood (Vp10) |
Current Local Requirement: Varies, but typically involves either 10-year design storm peak discharge control, or a combination of 10- and 25-year design storm peak discharge control. CGP Special Waters and Other Sensitive Receiving Waters: No additional requirements. |
Extreme Storm (Vp100) |
Current Local Requirement: Varies, but frequently involves 100-year design storm peak discharge control. In other cases, peak discharge control is waived if development is excluded from ultimate 100-year floodplain, or an acceptable downstream hydrologic analysis indicates it is not needed. Stormwater BMPs must be designed to provide safe overflow of the 100 year-peak discharge even if extreme storm control is not required at the site. CGP Special Waters and Other Sensitive Receiving Waters: No additional requirements. |