PKalinosky (talk | contribs) |
|||
Line 24: | Line 24: | ||
*[[media:Wq-strm4-90.pdf|Timeframes listed in the Construction Stormwater Permit]] - MPCA's document containing all of the time frame considerations that are detailed in the [https://stormwater.pca.state.mn.us/index.php?title=2018_Minnesota_Construction_Stormwater_Permit Construction stormwater permit Construction Stormwater Permit] | *[[media:Wq-strm4-90.pdf|Timeframes listed in the Construction Stormwater Permit]] - MPCA's document containing all of the time frame considerations that are detailed in the [https://stormwater.pca.state.mn.us/index.php?title=2018_Minnesota_Construction_Stormwater_Permit Construction stormwater permit Construction Stormwater Permit] | ||
*[[media: Construction-Stormwater-Permit-Small Lot.pdf|10 Steps to Stormwater Pollution Prevention on Small Residential Construction Sites]] - MPCA's factsheet on the 10 Steps to Stormwater Pollution Prevention on Small Residential Construction Sites. | *[[media: Construction-Stormwater-Permit-Small Lot.pdf|10 Steps to Stormwater Pollution Prevention on Small Residential Construction Sites]] - MPCA's factsheet on the 10 Steps to Stormwater Pollution Prevention on Small Residential Construction Sites. | ||
− | |||
===Documentation and tracking templates=== | ===Documentation and tracking templates=== |
Controlling sediment and other pollutants from construction sites is crucial to an effective stormwater management program. Minimum Control Measure (MCM) 4 of the MS4 General Permit requires permittees to have and enforce a construction site stormwater runoff control program to reduce the impacts of land disturbing activities to stormwater.
The construction site stormwater runoff control program must include:
Click on the blue links above in the "MS4 General Permit requirements" section to jump to the referenced section or page. Links to specific resources related to MCM 4 are listed below.
Fact sheets and guidance documents should provide background information and tips to inform your approach to implementing MCM 4 - Construction Site Stormwater Control.
Documentation and tracking templates are examples that local stormwater staff are currently using to meet the MS4 General Permit requirements for MCM 4 - Construction Site Stormwater Control.
Below are methods that local stormwater staff are currently using to meet the site inspection and site plan review documentation Construction Site Stormwater Runoff Control requirements in the MS4 General Permit for MCM 4 - Construction Site Stormwater Control.
Example procedures are those that local stormwater staff are currently using to meet the Construction Site Stormwater Runoff Control MS4 General Permit requirements for MCM 4 - Construction Site Stormwater Control.
Fill in the blanks and adopt ordinance language that meets the regulatory mechanism requirements for MS4 General Permit requirements for MCM 4 - Construction Site Stormwater Control.
Miscellaneous materials local stormwater staff are using.
The information in this section provides MS4 permittees with tools they can use to meet MCM 4, which addresses construction site stormwater runoff.