Line 60: | Line 60: | ||
*The project will disturb 50 or more acres AND has a discharge point within one mile of an impaired or [[Special Waters and Impaired Waters|special water]] listed in [[APPENDIX A|Appendix A]] of the construction stormwater general permit AND the discharge flows to these waters. Applications are due 30-days before the anticipated construction start date. | *The project will disturb 50 or more acres AND has a discharge point within one mile of an impaired or [[Special Waters and Impaired Waters|special water]] listed in [[APPENDIX A|Appendix A]] of the construction stormwater general permit AND the discharge flows to these waters. Applications are due 30-days before the anticipated construction start date. | ||
− | ===[[Construction Program FAQ]]=== | + | <!--===[[Construction Program FAQ]]=== |
<p>If your project must complete a paper form or if you are unable to use the online application, contact the MPCA at CSW.pca@State.mn.us or call the MPCA Stormwater Hotline at 651-757-2119 or 800-657-3804. For instructions on how attain a copy of the paper form.</p> | <p>If your project must complete a paper form or if you are unable to use the online application, contact the MPCA at CSW.pca@State.mn.us or call the MPCA Stormwater Hotline at 651-757-2119 or 800-657-3804. For instructions on how attain a copy of the paper form.</p> | ||
[http://www.pca.state.mn.us/index.php/view-document.html?gid=7389 Notice of Termination/Permit Modification Form] | [http://www.pca.state.mn.us/index.php/view-document.html?gid=7389 Notice of Termination/Permit Modification Form] | ||
<p>Use the Notice of Termination application to terminate permit coverage of the original Stormwater Permit number or the Subdivision Registration permit number.</p> | <p>Use the Notice of Termination application to terminate permit coverage of the original Stormwater Permit number or the Subdivision Registration permit number.</p> | ||
− | <p>How to Use the [[How to use the CSW Notice of Termination/Permit Modification Form|Notice of Termination/ Permit Modification Form]] (wq-strm2-60i)</p> | + | <p>How to Use the [[How to use the CSW Notice of Termination/Permit Modification Form|Notice of Termination/ Permit Modification Form]] (wq-strm2-60i)</p>--> |
[[Special Waters and Impaired Waters]] | [[Special Waters and Impaired Waters]] |
When stormwater drains off a construction site, it carries sediment and other pollutants that harm lakes, streams and wetlands. According to the 1996 National Water Quality Inventory, stormwater runoff is a leading source of water pollution. The U.S. Environmental Protection Agency (EPA) estimates that 20 to 150 tons of soil per acre is lost every year to stormwater runoff from construction sites.
Many studies indicate that controlling erosion can significantly reduce the amount of sedimentation and other pollutants transported by runoff from construction sites. To keep Minnesota’s valuable water resources clean the Minnesota Pollution Control Agency (MPCA) issues permits to construction site owners and their operators to prevent stormwater pollution during and after construction.
Site owners and their construction operators must sign off on a National Pollutant Discharge Elimination System (NPDES)/State Disposal System (SDS) General Stormwater Permit for Construction Activity (MN R100001) (Construction Stormwater General Permit). As part of the application for this legal document, the owner and operator must create a stormwater pollution prevention plan (SWPPP)that explains how they will control stormwater.
Once the SWPPP is complete, applicants must apply to receive permit coverage.
You need an NPDES/SDS permit if you are the owner or operator for any construction activity disturbing:
Construction activity does not include a disturbance to the land of less than five (5) acres for the purpose of routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of the facility.
Most construction activities are covered by the general NPDES stormwater permit for construction activity, but some construction sites need individual permit coverage. Owners and operators are both responsible for submitting the permit application.
If the project is owned by a Tribal unit you must obtain permit coverage from the US Environmental Protection Agency instead of the Minnesota Pollution Control Agency.
After determining if permit is required but prior to applying for permit coverage, a SWPPP must be completed. There are several steps that are required.
Since complying with the terms of the Construction Stormwater general permit is required the first step is to read and understand the General Stormwater Permit for Construction Activity (MN R100001)
The owner must develop a Stormwater Pollution Prevention Plan (SWPPP). The SWPPP shall be completed prior to submitting any permit application and prior to conducting any construction activity by any required Permittee(s)
The SWPPP must include the following:
Click here to log into the e-Services then once logged in, click on Construction Stormwater General Permit Application
Visa, Master cards or checks are accepted for the $400 fee payment.
A project is NOT eligible for online processing and must complete a paper form if: