m |
m |
||
Line 1,376: | Line 1,376: | ||
<tr> | <tr> | ||
<td rowspan=12>Physical feasibility</td> | <td rowspan=12>Physical feasibility</td> | ||
− | <td>Depth to water table</td> | + | <td rowspan=8>Depth to water table</td> |
<td>Better Site Design</td> | <td>Better Site Design</td> | ||
<td> </td> | <td> </td> | ||
Line 1,383: | Line 1,383: | ||
<tr> | <tr> | ||
− | |||
<td>Runoff minimization</td> | <td>Runoff minimization</td> | ||
<td>Capture and re-use</td> | <td>Capture and re-use</td> | ||
Line 1,390: | Line 1,389: | ||
<tr> | <tr> | ||
− | |||
<td>Bioretention</td> | <td>Bioretention</td> | ||
<td>Filtration</td> | <td>Filtration</td> | ||
Line 1,396: | Line 1,394: | ||
<tr> | <tr> | ||
− | |||
<td>Filtration</td> | <td>Filtration</td> | ||
<td>Media (sand)</td> | <td>Media (sand)</td> | ||
Line 1,402: | Line 1,399: | ||
<tr> | <tr> | ||
− | |||
<td>Filtration</td> | <td>Filtration</td> | ||
<td>Vegetative</td> | <td>Vegetative</td> | ||
Line 1,408: | Line 1,404: | ||
<tr> | <tr> | ||
− | |||
<td>Constructed wetlands</td> | <td>Constructed wetlands</td> | ||
<td>Shallow wetland</td> | <td>Shallow wetland</td> | ||
Line 1,414: | Line 1,409: | ||
<tr> | <tr> | ||
− | |||
<td>Constructed wetlands</td> | <td>Constructed wetlands</td> | ||
<td>ED shallow wetland</td> | <td>ED shallow wetland</td> | ||
Line 1,421: | Line 1,415: | ||
<tr> | <tr> | ||
− | |||
<td>Supplemental treatment</td> | <td>Supplemental treatment</td> | ||
<td>Hydrodynamic devices</td> | <td>Hydrodynamic devices</td> | ||
Line 1,427: | Line 1,420: | ||
<tr> | <tr> | ||
− | <td>Site slope</td> | + | <td rowspan=4>Site slope</td> |
<td>Better Site Design</td> | <td>Better Site Design</td> | ||
<td> </td> | <td> </td> | ||
Line 1,433: | Line 1,426: | ||
<tr> | <tr> | ||
− | |||
<td>Temporary construction sediment control</td> | <td>Temporary construction sediment control</td> | ||
<td>Perimeter</td> | <td>Perimeter</td> | ||
Line 1,439: | Line 1,431: | ||
<tr> | <tr> | ||
− | |||
<td>Temporary construction sediment control</td> | <td>Temporary construction sediment control</td> | ||
<td>Slope</td> | <td>Slope</td> | ||
Line 1,445: | Line 1,436: | ||
<tr> | <tr> | ||
− | |||
<td>Temporary construction sediment control</td> | <td>Temporary construction sediment control</td> | ||
<td>Drainageway</td> | <td>Drainageway</td> |
Recommended best management practices | ||||
---|---|---|---|---|
Pollution prevention | Pollution prevention | Municipal | ||
I/Ca | ||||
Runoff minimization | Volume reduction | |||
Capture and re-use | ||||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Inspect & maintain | ||||
Minimize runoff | Reduce volume | Better Site Design | ||
Runoff minimization | Volume reduction | |||
Capture and re-use | ||||
Bioretention | Infiltration recharge | |||
Filtration partial recharge | ||||
Infiltration filtration recharge | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Minimize runoff | Increase recharge | Better Site Design | ||
Runoff minimization | Volume reduction | |||
Capture and re-use | ||||
Bioretention | Infiltration recharge | |||
Filtration partial recharge | ||||
Infiltration filtration recharge | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Minimize runoff | Improve water quality | Better Site Design | ||
Pollution prevention | Residential | |||
Municipall | ||||
I/Ca | ||||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Inspect & maintain | ||||
Filtration | Vegetative | |||
Stormwater ponds | With extended detention | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Minimize runoff | Reduce costs | Better Site Design | ||
Temporary construction sediment control | Pre-construction | |||
Local feasibility | Pollution prevention | Residential | ||
Municipal | ||||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Cold climate | Better Site Design | |||
Pollution prevention | Municipal | |||
I/Ca | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Stormwater ponds | With extended detention | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetlandd | ||||
Pond wetland system | ||||
Supplemental treatment | Filtration devices | |||
Hydrodynamic devices | ||||
Temporary construction sediment control | Better Site Design | |||
Pollution prevention | Municipal | |||
I/Ca | ||||
Temporary construction sediment control | Pre-construction | |||
Perimeter | ||||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Inspect & maintain | ||||
Bioretention | Filtration | |||
Filtration | Media (sand) | |||
Vegetative | ||||
Stormwater ponds | With extended detention | |||
Without extended detention | ||||
Constructed wetlands | Pond wetland system | |||
Supplemental treatments | Filtration devices | |||
Hydrodynamic devices | ||||
Watershed factors | Lakes | Better Site Design | ||
Pollution preventionn | Residential | |||
Municipal | ||||
I/Ca | ||||
Runoff minimization | Volume reduction | |||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Bioretention | Infiltration recharge | |||
Filtration partial recharge | ||||
Infiltration filtration recharge | ||||
Filtration | ||||
Filtration | ||||
Media (sand) | ||||
Vegetative | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Stormwater ponds | With extended detention | |||
Without extended detention | ||||
Constructed wetlands | Pond wetland system | |||
Supplemental treatment | Chemical biological treatment | |||
Watershed factors | Trout resources | Better Site Design | ||
Runoff minimization | Volume reduction | |||
Temporary construction sediment control | Drainageway | |||
Bioretention | Infiltration recharge | |||
Filtration partial rechargee | ||||
Infiltration filtration recharge | ||||
Filtration | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Constructed wetlands | Pond wetland system | |||
Watershed factors | Drinking water | Better Site Design | ||
Pollution prevention | Residential | |||
Municipal | ||||
Runoff minimization | Volume reduction | |||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Bioretention | Infiltration recharge | |||
Filtration partial recharge | ||||
Infiltration filtration recharge | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Stormwater ponds | With extended detention | |||
Without extended detention | ||||
Constructed wetlands | Pond wetland system | |||
Watershed factors | Wetlands (calcareous fens) | Better Site Design | ||
Bioretention | Filtration partial recharge | |||
Infiltration filtration recharge | ||||
Filtration | ||||
Media (sand) | ||||
Vegetative | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Supplemental treatment | Chemical biological treatment | |||
Watershed factors | Impaired waters | Better Site Design | ||
Pollution prevention | Residential | |||
Municipal | ||||
Runoff minimization | Volume reduction | |||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Bioretention | Infiltration filtration recharge | |||
Filtration | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Climate and terrain | Active karst | Runoff minimization | Volume reduction | |
Capture and re-use | ||||
Temporary construction sediment control | Slope | |||
Bioretention | Filtration | |||
Filtration | Media (sand) | |||
Vegetative | ||||
Constructed wetland | Shallow wetland | |||
Low infiltration soil | Runoff minimization | Volume reduction | ||
Runoff minimization | Capture and re-use | |||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Climate and terrain | High snowfall | Pollution prevention | Municipal | |
Runoff minimization | Volume reduction | |||
Capture and re-use | ||||
Temporary construction sediment control | Slope | |||
Drainageway | ||||
Inspect & maintain | ||||
Bioretention | Infiltration filtration recharge | |||
Filtration | ||||
Infiltration | Infiltration trench | |||
Dry well | ||||
Underground system | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Supplemental treatment | Filtration devices | |||
Hydrodynamic devices | ||||
Low rainfall | Bioretention | Filtration | ||
Filtration | Media (sand) | |||
Vegetative | ||||
Stormwater ponds | Without extended detention | |||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Stormwater treatment suitability | Recharge | Better Site Design | ||
Runoff minimization | Volume reduction | |||
Capture and re-use | ||||
Bioretention | Infiltration recharge | |||
Filtration partial recharge | ||||
Infiltration filtration recharge | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Water quality | Better Site Design | |||
Pollution prevention | Residential | |||
Municipal | ||||
I/Ca | ||||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Otherb | ||||
Inspect & maintain | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Stormwater treatment suitability | Channel protection | Better Site Design | ||
Pollution prevention | Municipal | |||
Runoff minimization | Volume reduction | |||
Temporary construction sediment control | Perimeter | |||
Slope | ||||
Drainageway | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Pond wetland system | ||||
Stormwater treatment suitability | Peak discharge | Pollution prevention | Municipal | |
Runoff minimization | Volume reduction | |||
Temporary construction sediment control | Slope | |||
Bioretention | Infiltration recharge | |||
Filtration partial recharge | ||||
Filtration | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Infiltration | Infiltration basin | |||
Infiltration trench | ||||
Dry well | ||||
Underground system | ||||
Stormwater ponds | Stormwater ponds | |||
Without extended detention | ||||
Shallow wetland | ||||
ED shallow wetland | ||||
Pond wetland system | ||||
PSHc | Better Site Design | |||
Pollution prevention | Residential | |||
Municipal | ||||
I/Ca | ||||
Filtration | Media (sand) | |||
Vegetative | ||||
Infiltration | Infiltration basin | |||
Physical feasibility | Soils | Temporary construction sediment control | Perimeter | |
Slope | ||||
Drainageway | ||||
Bioretention | Filtration | |||
Filtration | Media (sand) | |||
Vegetative | ||||
Elevation difference | Bioretention | Filtration | ||
Depth to rock | Better Site Design | |||
Bioretention | Filtration | |||
Filtration | Media (sand) | |||
Vegetative | ||||
Constructed wetlands | Shallow wetland | |||
ED shallow wetland | ||||
Supplemental treatment | Hydrodynamic devices | |||
Physical feasibility | Depth to water table | Better Site Design | ||
Runoff minimization | Capture and re-use | |||
Bioretention | Filtration | |||
Filtration | Media (sand) | |||
Filtration | Vegetative | |||
Constructed wetlands | Shallow wetland | |||
Constructed wetlands | ED shallow wetland | |||
Supplemental treatment | Hydrodynamic devices | |||
Site slope | Better Site Design | |||
Temporary construction sediment control | Perimeter | |||
Temporary construction sediment control | Slope | |||
Temporary construction sediment control | Drainageway | |||
Physical feasibility | Ultra-urban | Better Site Design | ||
Physical feasibility | Ultra-urban | Pollution prevention | Residential | |
Physical feasibility | Ultra-urban | Pollution prevention | Municipal | |
Physical feasibility | Ultra-urban | Runoff minimization | Capture and re-use | |
Physical feasibility | Ultra-urban | Temporary construction sediment control | Perimeter | |
Physical feasibility | Ultra-urban | Temporary construction sediment control | Slope | |
Physical feasibility | Ultra-urban | Bioretention | Infiltration recharge | |
Physical feasibility | Ultra-urban | Bioretention | Filtration partial recharge | |
Physical feasibility | Ultra-urban | Bioretention | Infiltration filtration rechargee | |
Physical feasibility | Ultra-urban | Bioretention | Filtration | |
Physical feasibility | Ultra-urban | Filtration | Media (sand) | |
Physical feasibility | Ultra-urban | Filtration | Vegetative | |
Physical feasibility | Ultra-urban | Infiltration | Underground system | |
Physical feasibility | Ultra-urban | Supplemental treatment | Filtration devices | |
Physical feasibility | Ultra-urban | Supplemental treatment | Hydrodynamic devicess | |
Community and environment | Ease of maintenance | Better Site Design | ||
Community and environment | Ease of maintenance | Pollution prevention | Residential | |
Community and environment | Ease of maintenance | Pollution prevention | Municipal | |
Community and environment | Ease of maintenance | Temporary construction sediment control | Perimeter | |
Community and environment | Ease of maintenance | Temporary construction sediment control | Slope | |
Community and environment | Ease of maintenance | Filtration | Vegetative | |
Community and environment | Ease of maintenance | Constructed wetlands | Shallow wetland | |
Community and environment | Ease of maintenance | Constructed wetlands | ED shallow wetland | |
Community and environment | Ease of maintenance | Supplemental treatment | Filtration devices | |
Community and environment | Community acceptance | Better Site Design | s | |
Community and environment | Community acceptance | Pollution prevention | Residential | |
Community and environment | Community acceptance | Pollution prevention | Municipal | |
Community and environment | Community acceptance | Temporary construction sediment control | Perimeter | |
Community and environment | Community acceptance | Temporary construction sediment control | Perimeter | |
Community and environment | Community acceptance | Temporary construction sediment control | Slope | |
Community and environment | Community acceptance | Bioretention | Filtration | |
Community and environment | Community acceptance | Filtration | Vegetative | |
Community and environment | Community acceptance | Stormwater ponds | Stormwater ponds | |
Community and environment | Community acceptance | Stormwater ponds | Without extended detention | |
Community and environment | Community acceptance | Constructed wetlands | Shallow wetland | |
Community and environment | Community acceptance | Constructed wetlands | ED shallow wetland | |
Community and environment | Community acceptance | Constructed wetlands | Pond wetland system | |
Community and environment | Community acceptance | Supplemental treatment | Filtration devices | |
Community and environment | Construction cost | Better Site Design | ||
Community and environment | Construction cost | Temporary construction sediment control | Pre-construction | |
Community and environment | Construction cost | Temporary construction sediment control | Perimeter | |
Community and environment | Construction cost | Filtration | Vegetative | |
Community and environment | Habitat quality | Better Site Design | ||
Community and environment | Habitat quality | Bioretention | Infiltration recharge | |
Community and environment | Habitat quality | Bioretention | Filtration partial recharge | |
Community and environment | Habitat quality | Bioretention | Infiltration filtration recharge | |
Community and environment | Habitat quality | Bioretention | Filtration | |
Community and environment | Habitat quality | Filtration | Media (sand) | |
Community and environment | Habitat quality | Filtration | Vegetative | |
Community and environment | Habitat quality | Constructed wetlands | Shallow wetland | |
Community and environment | Habitat quality | Constructed wetlands | ED shallow wetland | |
Community and environment | Habitat quality | Constructed wetlands | Pond wetland system | |
Community and environment | Nuisance | Infiltration | Infiltration basin | |
Community and environment | Nuisance | Infiltration | Infiltration trench | |
Community and environment | Nuisance | Infiltration | Dry well | |
Community and environment | Nuisance | Infiltration | Underground system | |
Location-specific restrictions and setbacks | Pollution prevention | Municipal | ||
Location-specific restrictions and setbacks | Temporary construction sediment control | Drainageway | ||
Knowledge of performance and reliability | Better Site Design | |||
Knowledge of performance and reliability | Pollution prevention | Municipal | ||
Knowledge of performance and reliability | Pollution prevention | I/Ca | ||
Knowledge of performance and reliability | Runoff minimization | Volume reduction | ||
Knowledge of performance and reliability | Temporary construction sediment control | Perimeter | ||
Knowledge of performance and reliability | Temporary construction sediment control | Slope | ||
Knowledge of performance and reliability | Temporary construction sediment control | Drainageway | ||
Knowledge of performance and reliability | Temporary construction sediment control | Inspect & maintain | ||
Knowledge of performance and reliability | Bioretention | Filtration | ||
Knowledge of performance and reliability | Filtration | Media (sand) | ||
Knowledge of performance and reliability | Filtration | Vegetative | ||
Knowledge of performance and reliability | Stormwater ponds | Stormwater ponds | ||
Knowledge of performance and reliability | Stormwater ponds | Without extended detention | ||
Knowledge of performance and reliability | Constructed wetlands | Shallow wetland | ||
Knowledge of performance and reliability | Constructed wetlands | ED shallow wetland | ||
Knowledge of performance and reliability | Constructed wetlands | Pond wetland system |