m |
m |
||
Line 1: | Line 1: | ||
− | <font size=3>'''Summary of specifications for materials under the pavement surface.'''</font size><br> | + | <font size=3>'''Summary of specifications for materials under the pavement surface.<sup>1</sup>'''</font size><br> |
Link to this [[Specifications for materials under permeable pavement surface|table]] | Link to this [[Specifications for materials under permeable pavement surface|table]] | ||
Line 46: | Line 46: | ||
</tr> | </tr> | ||
</table> | </table> | ||
+ | <font size=1><sup>1</sup>for additional information on materials referenced in this table (e.g. stone dimensions), see the following links: | ||
+ | *stone size [http://laurelaggregates.com/stone-types 1], [ftp://ftp.dot.state.fl.us/lts/CO/Specifications/SpecBook/2010Book/901.pdf 2 (see Table 1)] | ||
+ | *definitions of aggregates [ftp://ftp.dot.state.fl.us/lts/CO/Specifications/SpecBook/2010Book/901.pdf 1] | ||
+ | *information on geotextiles [ftp://ftp.wfl.fhwa.dot.gov/geotech/Geotech%20FP-12/207,%20714%20-%20Geosynthetics/AASHTO%20M-288%20spec%20%28DAN%29.pdf 1], [http://www.tencate.com/amer/Images/TN_aashto0608_tcm29-16706.pdf 2] | ||
+ | *liners [http://stormwater.pca.state.mn.us/index.php/Liners_for_stormwater_management 1]</font size> | ||
+ | |||
+ | |||
<noinclude>[[category:table]]</noinclude> | <noinclude>[[category:table]]</noinclude> |
Summary of specifications for materials under the pavement surface.1
Link to this table
Bedding/choker layer |
|
Washed free of fines |
Reservoir Layer |
|
Stone layer thickness based on the pavement structural and hydraulic requirements. Stonewashed and free of fines. Recommended minimum void ratio = 0.4. |
Underdrain (optional) | Use 4 to 6 inch diameter perforated PVC (AASHTO M-252) pipe or corrugated polyethylene pipe. Perforated pipe installed for the full length of the permeable pavement cell, and non-perforated pipe, as needed,connected to storm drainage system. | |
Filter Layer (optional) | Sand filter layeris separated from base above and native soils with geotextile. Sand layer typically ASTM C33 gradation, 6 to 12 inches thick. | The sand layer may require a choker layer on surface to provide transition to base layerstone. |
Geotextile(optional) | Comply with AASHTO M-288 Standard Specification for Geotextile Specification for Highway Applications, drainage and separation applications, Class I or II. Porous asphalt industry recommends non-woven geotextile. | |
Impermeable Liner | Use a minimum 30mil PVC liner covered by 12 ounce/square yard non-woven geotextile. EPDM and HDPE liner material is also acceptable. | |
Observation Well | Use a perforated 4 to 6 inch vertical PVC pipe (AASHTO M-252) with a lockable cap, installedflush with the surface (or under pavers). |
1for additional information on materials referenced in this table (e.g. stone dimensions), see the following links: