[[File:bioinfiltration MIDS.png|thumb|300px|alt=MIDS symbol for bioinfiltration|<font size=3>Symbol used for bioretention without an underdrain (bioinfiltration) in the MIDS calculator.</font size>]]
 
[[File:bioinfiltration MIDS.png|thumb|300px|alt=MIDS symbol for bioinfiltration|<font size=3>Symbol used for bioretention without an underdrain (bioinfiltration) in the MIDS calculator.</font size>]]
  
For a bioinfiltration system, all stormwater runoff captured by the BMP is infiltrated into the underlying soil between rain events.  All pollutants in the captured water are credited as being reduced.  Pollutants in the stormwater that bypasses the BMP are not reduced.
+
For a [[Bioretention terminology|bioinfiltration]] system, all stormwater runoff captured by the BMP is infiltrated into the underlying soil between rain events.  All pollutants in the captured water are credited as being reduced.  Pollutants in the stormwater that bypasses the BMP are not reduced.
  
 
==MIDS calculator user inputs for bioinfiltration==
 
==MIDS calculator user inputs for bioinfiltration==
Line 15: Line 15:
 
**BMP Watershed Area: BMP watershed areas are the areas draining directly to the BMP. Values can be added for four soil types ([[Glossary#H|Hydrologic Soil Groups]] (HSG) A, B, C, D) and for three Land Cover types (Forest/Open Space, Managed Turf and impervious).  The surface area of the BMP should be included as a managed turf land cover under the hydrologic soils group of the native soils located under the BMP. Units are in acres.
 
**BMP Watershed Area: BMP watershed areas are the areas draining directly to the BMP. Values can be added for four soil types ([[Glossary#H|Hydrologic Soil Groups]] (HSG) A, B, C, D) and for three Land Cover types (Forest/Open Space, Managed Turf and impervious).  The surface area of the BMP should be included as a managed turf land cover under the hydrologic soils group of the native soils located under the BMP. Units are in acres.
 
*'''BMP Parameters tab''':  
 
*'''BMP Parameters tab''':  
**Overflow surface area (AO): This is the surface area at the lowest outlet point from the BMP. The user inputs this value in square feet.  
+
**Overflow surface area (A<sub>O</sub>): This is the surface area at the lowest outlet point from the BMP. The user inputs this value in square feet.  
**Media surface area (AM): This is the surface area at the bottom of the ponded water within the BMP. Therefore, this is the area at the surface of the media. The user inputs this value in square feet.
+
**Media surface area (A<sub>M</sub>): This is the surface area at the bottom of the ponded water within the BMP. Therefore, this is the area at the surface of the media. The user inputs this value in square feet.
**Overflow depth (DO): This is the maximum depth of ponded water within the BMP (i.e., distance from the overflow elevation to the top of the soil or media). The user inputs this value in feet. The maximum value allowed for this depth is 1.5 feet or a depth defined by the requirement to drain ponded water within 48 hours, whichever is less.
+
**Overflow depth (D<sub>O</sub>): This is the maximum depth of ponded water within the BMP (i.e., distance from the overflow elevation to the top of the soil or media). The user inputs this value in feet. The maximum value allowed for this depth is 1.5 feet or a depth defined by the requirement to drain ponded water within 48 hours, whichever is less.
 
**Underlying soil - Hydrologic Soil Group: The user selects the most restrictive soil (lowest hydraulic conductivity) within three feet of the soil/media interface in the bioinfiltration basin. There are 14 soil options that fall into 4 different Hydrologic Soil Groups (Hydrologic Soil Group (HSG) A, B, C, or D) for the user. Once a soil type is selected, the corresponding [[Design infiltration rates|infiltration rate]] will populate in the ''Infiltration rate of underlying soils'' field. The user may also select ''User Defined''. This selection will activate the ''User Defined Infiltration Rate'' cell allowing the user to enter a different value from the values in the predefined selection list. The maximum allowable infiltration rate is 1.63 inches per hour.
 
**Underlying soil - Hydrologic Soil Group: The user selects the most restrictive soil (lowest hydraulic conductivity) within three feet of the soil/media interface in the bioinfiltration basin. There are 14 soil options that fall into 4 different Hydrologic Soil Groups (Hydrologic Soil Group (HSG) A, B, C, or D) for the user. Once a soil type is selected, the corresponding [[Design infiltration rates|infiltration rate]] will populate in the ''Infiltration rate of underlying soils'' field. The user may also select ''User Defined''. This selection will activate the ''User Defined Infiltration Rate'' cell allowing the user to enter a different value from the values in the predefined selection list. The maximum allowable infiltration rate is 1.63 inches per hour.
 
**Required drawdown time (hrs): This is the time in which the stormwater captured by and ponded within the BMP must drain into the underlying soil/media. The user selects from predefined values of 48 or 24 hours. The MPCA [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Construction Stormwater General Permit] requires drawdown within 48 hours, but 24 hours is highly recommended when discharges are to a trout stream. The calculator uses the underlying soil infiltration rate and the overflow depth to check if the BMP is meeting the drawdown time requirement. The user will encounter an error and be required to enter a new overflow depth if the water stored in the BMP cannot drawdown in the required time.  
 
**Required drawdown time (hrs): This is the time in which the stormwater captured by and ponded within the BMP must drain into the underlying soil/media. The user selects from predefined values of 48 or 24 hours. The MPCA [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Construction Stormwater General Permit] requires drawdown within 48 hours, but 24 hours is highly recommended when discharges are to a trout stream. The calculator uses the underlying soil infiltration rate and the overflow depth to check if the BMP is meeting the drawdown time requirement. The user will encounter an error and be required to enter a new overflow depth if the water stored in the BMP cannot drawdown in the required time.  
*'''BMP Summary Tab''': The BMP Summary tab summarizes the volume and pollutant reductions provided by the specific BMP. It details the performance goal volume reductions and annual average volume, dissolved P, particulate P, and TSS load reductions. Included in the summary are the total volume and pollutant loads received by the BMP from its direct watershed, from upstream BMPs and a combined value of the two. Also included in the summary, are the volume and pollutant load reductions provided by the BMP, in addition to the volume and pollutant loads that exit the BMP through the outflow. This outflow load and volume is what is routed to the downstream BMP if one is defined in the Watershed tab. Finally, percent reductions are provided for the percent of the performance goal achieved, percent annual runoff volume retained, total percent annual particulate phosphorus reduction, total percent annual dissolved phosphorus reduction, total percent annual TP reduction, and total percent annual TSS reduction.
+
*'''BMP Summary Tab''': The BMP Summary tab summarizes the volume and pollutant reductions provided by the specific BMP. It details the performance goal volume reductions and annual average volume, dissolved P, particulate P, and TSS load reductions. Included in the summary are the total volume and pollutant loads received by the BMP from its direct watershed, from upstream BMPs and a combined value of the two. Also included in the summary, are the volume and pollutant load reductions provided by the BMP, in addition to the volume and pollutant loads that exit the BMP through the outflow. This outflow load and volume is what is routed to the downstream BMP if one is defined in the ''Watershed'' tab. Finally, percent reductions are provided for the percent of the performance goal achieved, percent annual runoff volume retained, total percent annual particulate phosphorus reduction, total percent annual dissolved phosphorus reduction, total percent annual TP reduction, and total percent annual TSS reduction.
  
 
==Model input requirements and recommendations==
 
==Model input requirements and recommendations==
Line 30: Line 30:
  
 
Where
 
Where
:DO is the overflow depth (ft); and
+
:D<sub>O</sub> is the overflow depth (ft); and
:IR is the infiltration rate of the native soils (inches/hr).
+
:I<sub>R</sub> is the infiltration rate of the native soils (inches/hr).
  
 
:If DDT<sub>calc</sub> is greater than the user defined required drawdown time then the user will be prompted to enter a new overflow depth or infiltration rate.
 
:If DDT<sub>calc</sub> is greater than the user defined required drawdown time then the user will be prompted to enter a new overflow depth or infiltration rate.
Line 39: Line 39:
 
==Methodology==
 
==Methodology==
 
===Required Treatment Volume===
 
===Required Treatment Volume===
''Required treatment volume,'' or the volume of stormwater runoff delivered to the BMP, equals the performance goal (1.1 inches or user-specified performance goal) times the impervious area draining to the BMP plus any water routed to the BMP from an upstream BMP. This stormwater is delivered to the BMP instantaneously following the [http://www.stormh2o.com/SW/Articles/Kerplunk_15253.aspx Kerplunk method].
+
''Required treatment volume,'' or the volume of stormwater runoff delivered to the BMP, equals the performance goal ([[Performance goals for new development, re-development and linear projects|1.1 inches for MIDS]] or user-specified performance goal) times the impervious area draining to the BMP plus any water routed to the BMP from an upstream BMP. This stormwater is delivered to the BMP instantaneously following the [http://www.stormh2o.com/SW/Articles/Kerplunk_15253.aspx Kerplunk method].
  
 
===Volume Reduction===
 
===Volume Reduction===

Revision as of 01:12, 2 September 2014

This site is currently undergoing revision. For more information, open this link.
The anticipated construction period for this page is through August, 2014
MIDS symbol for bioinfiltration
Symbol used for bioretention without an underdrain (bioinfiltration) in the MIDS calculator.

For a bioinfiltration system, all stormwater runoff captured by the BMP is infiltrated into the underlying soil between rain events. All pollutants in the captured water are credited as being reduced. Pollutants in the stormwater that bypasses the BMP are not reduced.

MIDS calculator user inputs for bioinfiltration

screen shot bioinfiltration watershed tab
Screen shot of bioretention without an underdrain (bioinfiltration) watershed tab for the MIDS calculator.
screen shot bioinfiltration BMP parameters tab
Screen shot of the BMP Parameters tab for bioretention without an underdrain (bioinfiltration

For bioinfiltration systems, the user must input the following parameters to calculate the volume and pollutant load reductions associated with the BMP.

  • Watershed tab:
    • BMP Name: this cell is auto-filled but can be changed by the user.
    • Routing/downstream BMP: if this BMP is part of a treatment train and water is being routed from this BMP to another BMP, the user selects the name of the BMP from the dropdown box to which water is being routed. All water must be routed to a single downstream BMP. Note that the User must include the BMP receiving the routed water in the Schematic or the BMP will not appear in the dropdown box.
    • BMP Watershed Area: BMP watershed areas are the areas draining directly to the BMP. Values can be added for four soil types (Hydrologic Soil Groups (HSG) A, B, C, D) and for three Land Cover types (Forest/Open Space, Managed Turf and impervious). The surface area of the BMP should be included as a managed turf land cover under the hydrologic soils group of the native soils located under the BMP. Units are in acres.
  • BMP Parameters tab:
    • Overflow surface area (AO): This is the surface area at the lowest outlet point from the BMP. The user inputs this value in square feet.
    • Media surface area (AM): This is the surface area at the bottom of the ponded water within the BMP. Therefore, this is the area at the surface of the media. The user inputs this value in square feet.
    • Overflow depth (DO): This is the maximum depth of ponded water within the BMP (i.e., distance from the overflow elevation to the top of the soil or media). The user inputs this value in feet. The maximum value allowed for this depth is 1.5 feet or a depth defined by the requirement to drain ponded water within 48 hours, whichever is less.
    • Underlying soil - Hydrologic Soil Group: The user selects the most restrictive soil (lowest hydraulic conductivity) within three feet of the soil/media interface in the bioinfiltration basin. There are 14 soil options that fall into 4 different Hydrologic Soil Groups (Hydrologic Soil Group (HSG) A, B, C, or D) for the user. Once a soil type is selected, the corresponding infiltration rate will populate in the Infiltration rate of underlying soils field. The user may also select User Defined. This selection will activate the User Defined Infiltration Rate cell allowing the user to enter a different value from the values in the predefined selection list. The maximum allowable infiltration rate is 1.63 inches per hour.
    • Required drawdown time (hrs): This is the time in which the stormwater captured by and ponded within the BMP must drain into the underlying soil/media. The user selects from predefined values of 48 or 24 hours. The MPCA Construction Stormwater General Permit requires drawdown within 48 hours, but 24 hours is highly recommended when discharges are to a trout stream. The calculator uses the underlying soil infiltration rate and the overflow depth to check if the BMP is meeting the drawdown time requirement. The user will encounter an error and be required to enter a new overflow depth if the water stored in the BMP cannot drawdown in the required time.
  • BMP Summary Tab: The BMP Summary tab summarizes the volume and pollutant reductions provided by the specific BMP. It details the performance goal volume reductions and annual average volume, dissolved P, particulate P, and TSS load reductions. Included in the summary are the total volume and pollutant loads received by the BMP from its direct watershed, from upstream BMPs and a combined value of the two. Also included in the summary, are the volume and pollutant load reductions provided by the BMP, in addition to the volume and pollutant loads that exit the BMP through the outflow. This outflow load and volume is what is routed to the downstream BMP if one is defined in the Watershed tab. Finally, percent reductions are provided for the percent of the performance goal achieved, percent annual runoff volume retained, total percent annual particulate phosphorus reduction, total percent annual dissolved phosphorus reduction, total percent annual TP reduction, and total percent annual TSS reduction.

Model input requirements and recommendations

The following are requirements or recommendations for inputs into the MIDS calculator. If the following are not met, an error message will inform the user to change the input to meet the requirement.

  • Overflow depth cannot be greater than 1.5 feet.
  • The basin must meet the drawdown time requirement specified. The drawdown time requirement is checked by comparing the user defined drawdown time with the calculated drawdown time (DDTcalc), given by

\(DDT_{calc} = D_O / (I_R / 12)\)

Where

DO is the overflow depth (ft); and
IR is the infiltration rate of the native soils (inches/hr).
If DDTcalc is greater than the user defined required drawdown time then the user will be prompted to enter a new overflow depth or infiltration rate.
  • Infiltration rates of the underlying soils are restricted to a maximum of 1.63 inches/hour.
  • The Media surface area must be equal to or smaller than the Overflow surface area.

Methodology

Required Treatment Volume

Required treatment volume, or the volume of stormwater runoff delivered to the BMP, equals the performance goal (1.1 inches for MIDS or user-specified performance goal) times the impervious area draining to the BMP plus any water routed to the BMP from an upstream BMP. This stormwater is delivered to the BMP instantaneously following the Kerplunk method.

Volume Reduction

The volume reduction achieved by a BMP compares the capacity of the BMP to the required treatment volume. The Volume reduction capacity of BMP is calculated using BMP inputs provided by the user. For this BMP, the Volume reduction capacity is equal to the amount of stormwater that can be instantaneously captured above the media and below the overflow point. The captured volume (V) is given by

\(V = ((A_O + A_M) / 2) * D_O\)

Where:

AO is the overflow surface area (ft);
AM Is the media surface area (ft); and
DO is the overflow depth (ft).

The Volume of retention provided by BMP is the amount of volume credit the BMP provides toward the performance goal. This value is equal to the lesser of the Volume reduction capacity of BMP calculated using the above method or the Required treatment volume. This check makes sure that the BMP is not getting more credit than necessary to meet the performance goal. For example, if the BMP is oversized the user will only receive credit for the Required treatment volume routed to the BMP, which corresponds with meeting the performance goal for the site.

Pollutant Reduction

schematic showing how pollutants are treated by bioinfiltration in MIDS calculator
Schematic showing how pollutants are treated by bioretention without an underdrain (bioinfiltration) in the MIDS calculator. Pollutants captured by the BMP infiltrate into the underlying soil, thus resulting in complete removal of pollutants captured by the BMP.

Pollutant load reductions are calculated on an annual basis. Therefore, the first step in calculating annual pollutant load reductions is converting the Volume reduction capacity of BMP, which is an instantaneous volume reduction, to an annual volume reduction percentage. This is accomplished through the use of performance curves developed from multiple modeling scenarios. The performance curves use the Volume reduction capacity of BMP, the infiltration rate of the underlying soils, the contributing watershed percent impervious area, and the size of the contributing watershed to calculate a percent annual volume reduction. While oversizing a BMP above the Required treatment volume will not provide additional credit towards the performance goal volume, it may provide additional annual volume and pollutant load reduction.

A 100 percent removal is credited for all pollutants associated with the reduced volume of stormwater since these pollutants are either attenuated within the media or pass into the underlying soil with infiltrating water. Pollutants in the stormwater that bypasses the BMP through overflow are not reduced. A schematic of the removal rates can be seen in the sidebar.

NOTE: The user can modify event mean concentrations (EMCs) on the Site Information tab in the calculator. Default concentrations are 54.5 milligrams per liter for total suspended solids (TSS) and 0.3 milligrams per liter for total phosphorus (particulate plus dissolved). The calculator will notify the user if the default is changed. Changing the default EMC will result in changes to the total pounds of pollutant reduced.

Routing

A bioinfiltration basin can be routed to any other BMP, except for a green roof and a swale side slope or any BMP that would cause stormwater to be rerouted back to the bioinfiltration basin already in the stormwater runoff treatment sequence. All BMPs can be routed to a bioinfiltration basin, except for a swale side slope BMP.

Assumptions

The following general assumptions apply in calculating the credit for a bioretention basin. If these assumptions are not followed the volume and pollutant reduction credits cannot be applied.

  • The bioretention basin has been properly designed, constructed and will be properly maintained.
  • Stormwater runoff entering the bioretention basin has undergone pretreatment.

Stormwater captured by the BMP enters the BMP instantaneously and is initially ponded within the BMP. This will underestimate actual infiltration since some water will enter the soil/media during a rain event, thus creating more volume for storage in the BMP.

Example application in the MIDS calculator (Version 2)

schematic used for the bioinfiltration example in the MIDS calculator
Schematic used for the MIDS calculator example for bioretention without an underdrain (bioinfiltration). This example has 1.4 acres of impervious parking lot draining to a bioinfiltration basin. total pervious surface is 0.8 acres and includes the Turf Area and the bioinfiltration basin. See Step 1.
screen shot watershed tab bioinfiltration
Screen shot of the watershed tab for bioretention without an undeerdrain (bioinfiltration). In this example, the user has entered a zip code and acreages for pervious and impervious surfaces. The BMP has a default name and is not routed to another BMP. See Step 2.
screen shot of schematic tab for bioinfiltration
Screen shot of the schemtaic tab for bioretention without an underdrain (bioinfiltration). The User has dropped the Bioretention basin (w/o underdrain) icon onto the MIDS screen. See Step 3.

A bioretention basin without an underdrain is to be constructed in a watershed that contains a 1.4 acre parking lot surrounded by 0.8 acres of pervious area (turf area and the bioretention BMP). All of the runoff from the watershed will be treated by the bioretention basin. The soils across the entire area have a unified soils classification of SM (HSG type B soil). The bioretention basin is designed to have 1 foot of ponding depth below the overflow. The surface area of the bioretention basin at the overflow point will be 6534 square feet. If the outflow point is a pipe, the area is taken at the invert of the overflow pipe. The bottom surface area (the area at the media surface) is 5600 square feet. Following the MPCA Construction Stormwater General Permit requirement, ponded water in the bioretention basin needs to drawdown in a 48 hour time period. The following steps detail how this system would be set up in the MIDS calculator.

Step 1: Determine the watershed characteristics of your entire site. For this example we have a 2.2 acre site with 1.4 acres of impervious area and 0.8 acres of pervious area in type B soils. The pervious area includes the turf area and the area of the bioretention basin. The entire site drains into the bioretention basin.

Step 2: Fill in the site specific information into the Site Information tab. This includes entering a Zip Code (55414 for this example) and the watershed information from Step 1. The Managed turf area includes the turf area and the area of the bioretention basin. Zip code and impervious area must be filled in or an error message will be generated. Other fields on this screen are optional.

Step 3: Go to the Schematic tab and drag and drop the Bioretention basin (w/o underdrain) icon into the Schematic Window

Step 4: Open the BMP properties for the bioretention basin by right clicking on the Bioretention basin (w/o underdrain) icon and selecting Edit BMP properties, or by double clicking on the Bioretention basin (w/o underdrain) icon.

Step 5: If help is needed, click on the Minnesota Stormwater Manual Wiki link or the Help button to review input parameter specifications and calculation specific to the Bioretention basin (w/o underdrain) BMP.

Step 6: Determine the watershed characteristics for the Bioretention basin. For this example the entire site is draining to the bioretention basin. The watershed parameters therefore include a 2.2 acre site with 1.4 acres of impervious area and 0.8 acres of pervious turf area in type B soils. There is no routing for this BMP. Fill in the BMP specific watershed information (1.4 acres on impervious cover and 0.8 acres of Managed turf in B soils).

Step 7: Click on the BMP Parameters tab and enter the BMP design parameters. Bioretention basin with no underdrain requires the following entries.

  • Overflow surface area which is 6534 square feet;
  • Bottom surface area which is 5600 square feet;
  • Overflow depth which is 1 foot;
  • Underlying soil – Hydrologic Soil Group which is SM (HSG B; 0.45 in/hr) from the dropdown box; and
  • Required drawdown time (hrs) which is 48 from the dropdown box.

Step 8: Click on BMP Summary tab to view results for this BMP.

Step 9: Click on the OK button to exit the BMP properties screen.

Step 10: Click on Results tab to see overall results for the site.

Requirements

image illustrating separation distance to bedrock or seasonal high water table
Measurement of depth from the bottom of the infiltration BMP to the seasonally high water table or bedrock. Note that there must be a minimum of 2 feet separation when soils beneath the BMP are ripped, with a total separation distance of 3 feet or more. Infiltration BMPs include any BMP that allows water to infiltrate into the underlying soil.
Warning: The following are requirements of the Minnesota Construction Stormwater General Permit
  • 3 foot separation from the bottom of an infiltration system to the seasonal high water table
  • Use the most restrictive infiltration rate within 3 feet of the bottom of the BMP
  • For measured infiltration rates, apply a safety factor of 2
  • Pretreatment for infiltration systems

Recommendations

Caution: The following are recommendations for inputs into the MIDS calculator
  • Drawdown time of 24 hours when the discharge is to trout streams
  • Field tested infiltration rates rather than table values