m
m
Line 64: Line 64:
 
<td>Stormwater ponds</td>
 
<td>Stormwater ponds</td>
 
<td>1-3%</td>
 
<td>1-3%</td>
<td>25 acre minimum<sup>b</sup></td>
+
<td>10 to 25 acres recommended<sup>b</sup></td>
 
<td>A or B soils may require liner</td>
 
<td>A or B soils may require liner</td>
 
<td>3-10 feet</td>
 
<td>3-10 feet</td>
Line 83: Line 83:
 
</table>
 
</table>
 
<font size=1><sup>a</sup>Surface area as a function of contributing surface area, except for ponds and wetlands, where it is a function of entire drainage area<br>
 
<font size=1><sup>a</sup>Surface area as a function of contributing surface area, except for ponds and wetlands, where it is a function of entire drainage area<br>
<sup>b</sup>10 acres may be feasible if groundwater is intercepted and/or if water balance calculations indicate a wet pool can be sustained<br>
+
<sup>b</sup>10 acres or less may be feasible if groundwater is intercepted and/or if water balance calculations indicate a wet pool can be sustained<br>
 
<sup>c</sup>Slope is defined as the slope across the proposed location of the practice<br>
 
<sup>c</sup>Slope is defined as the slope across the proposed location of the practice<br>
 
<sup>d</sup>Infiltration gallery could be designed to provide limited recharge</font size>
 
<sup>d</sup>Infiltration gallery could be designed to provide limited recharge</font size>
  
 
<noinclude>[[category:table]]</noinclude>
 
<noinclude>[[category:table]]</noinclude>

Revision as of 17:45, 3 September 2014

This table shows guidance on BMP selection based on physical feasibility characteristics of a site.
Link to this table.

BMP group Surface areaa Drainage area Soil infiltration rate Head Separation from bedrock Depth to seasonally high water table Maximum slopec Ultra-urban
Bioretention 7-10%; Minimum 200 ft2 b 5 acre maximum; 0.5-2.0 acre preferred Any soil; use underdrain for C and D soilsd 4-6 feet 3 feet 3 feet 20%Yes
Filtration - media Negligible, except for access 5 acre maximum; 0.5-2.0 acre preferred Media part of designd 2-6 feet0 feet if enclosed 3 feet for vegetated; 0 feet if enclosed 20%Yes
Filtration - vegetative Varies based on depth 10 acre maximum Media part of design 2-6 feet 0 feet if enclosed 3 feet for vegetated; 0 feet if enclosed 20%Possible
Infiltration trench Varies based on depth 5 to 10 acre maximum Native soils with i >= 0.2 inches/hour 2-12 feet 3 feet 3 feet 15%Possible
Infiltration basin Varies based on depth 5 to 50 acre maximum Native soils with i >= 0.2 inches/hour 2-12 feet 3 feet 3 feet 15%No
Stormwater ponds 1-3% 10 to 25 acres recommendedb A or B soils may require liner 3-10 feet 0 feet (shallow soil limits design) 0 feet (except if hotspot or aquifer) 25%No
Constructed wetlands 2-4% 25 acre minimumb A or B soils may require liner 3-10 feet 0 feet 0 feet (except if hotspot or aquifer) 25%No

aSurface area as a function of contributing surface area, except for ponds and wetlands, where it is a function of entire drainage area
b10 acres or less may be feasible if groundwater is intercepted and/or if water balance calculations indicate a wet pool can be sustained
cSlope is defined as the slope across the proposed location of the practice
dInfiltration gallery could be designed to provide limited recharge