(Created page with "<center><font size=3>'''Table summarizing specifications for materials under the pavement surface.'''</font size><br> Link to this [[Specifications for materials under permeab...")
 
m
Line 10: Line 10:
 
<tr>
 
<tr>
 
<td>Bedding/choker layer</td>
 
<td>Bedding/choker layer</td>
<td>*Pervious concrete: None
+
<td>
 +
*Pervious concrete: None
 
*Porous asphalt: 1inch of AASHTO No. 57 stone
 
*Porous asphalt: 1inch of AASHTO No. 57 stone
 
*PICP:  2 inches of AASHTO No. 8 stone (MnDOT 3127FA-3)</td>
 
*PICP:  2 inches of AASHTO No. 8 stone (MnDOT 3127FA-3)</td>
Line 17: Line 18:
 
<tr>
 
<tr>
 
<td>Reservoir Layer</td>
 
<td>Reservoir Layer</td>
<td>*Pervious concrete: AASHTO No. 57 stone or per hydraulic design
+
<td>
 +
*Pervious concrete: AASHTO No. 57 stone or per hydraulic design
 
*Porous asphalt:AASHTO No. 2, 3, or 5  stone
 
*Porous asphalt:AASHTO No. 2, 3, or 5  stone
 
*PICP:  4 inches of AASHTO No. 57 base and AASHTO No.2, 3 or 4 stone subbase</td>
 
*PICP:  4 inches of AASHTO No. 57 base and AASHTO No.2, 3 or 4 stone subbase</td>

Revision as of 17:05, 4 January 2013

Table summarizing specifications for materials under the pavement surface.
Link to this table
Material
Specification
Notes
Bedding/choker layer
  • Pervious concrete: None
  • Porous asphalt: 1inch of AASHTO No. 57 stone
  • PICP: 2 inches of AASHTO No. 8 stone (MnDOT 3127FA-3)
Washed free of fines
Reservoir Layer
  • Pervious concrete: AASHTO No. 57 stone or per hydraulic design
  • Porous asphalt:AASHTO No. 2, 3, or 5 stone
  • PICP: 4 inches of AASHTO No. 57 base and AASHTO No.2, 3 or 4 stone subbase
Stone layer thickness based on the pavement structural and hydraulic requirements. Stonewashed and free of fines. Recommended minimum void ratio = 0.4.
Underdrain (optional) Use 4 to 6 inch diameter perforated PVC (AASHTO M-252) pipe or corrugated polyethylene pipe. Perforated pipe installed for the full length of the permeable pavement cell, and non-perforated pipe, as needed,connected to storm drainage system.
Filter Layer (optional) Sand filter layeris separated from base above and native soils with geotextile. Sand layer typically ASTM C33 gradation, 6 to 12 inches thick. The sand layer may require a choker layer on surface to provide transition to base layerstone.
Geotextile(optional) Comply with AASHTO M-288 Standard Specification for Geotextile Specification for Highway Applications, drainage and separation applications, Class I or II. Porous asphalt industry recommends non-woven geotextile.
Impermeable Liner Use a minimum 30mil PVC liner covered by 12 ounce/square yard non-woven geotextile. EPDM andHDPE liner material is also acceptable.
Observation Well Use a perforated 4 to 6 inch vertical PVC pipe (AASHTO M-252) with a lockable cap, installedflush with the surface (or under pavers).