m |
m |
||
Line 1: | Line 1: | ||
− | <font size=3>'''Bioretention device cost estimate worksheet.''' | + | <font size=3>'''Bioretention device cost estimate worksheet.'''<br> |
− | Link to this [[Bioretention device cost estimate worksheet|table]] | + | Link to this [[Bioretention device cost estimate worksheet|table]]</font size> |
<table class="sortable"> | <table class="sortable"> | ||
Line 23: | Line 23: | ||
<td colspan=4> </td> | <td colspan=4> </td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<th>Description</th> | <th>Description</th> | ||
Line 32: | Line 30: | ||
<th>Total Estimated Price</th> | <th>Total Estimated Price</th> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<th colspan=5>'''Site Preparation'''</th> | <th colspan=5>'''Site Preparation'''</th> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>Tree removal - up to 12" diameter</td> | <td>Tree removal - up to 12" diameter</td> | ||
Line 67: | Line 61: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<th colspan=5>'''Site Formation'''</th> | <th colspan=5>'''Site Formation'''</th> | ||
Line 96: | Line 89: | ||
<th colspan=5>'''Structural Components'''</th> | <th colspan=5>'''Structural Components'''</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Underdrain - with pea gravel and geotextile</td> | <td>Underdrain - with pea gravel and geotextile</td> | ||
Line 111: | Line 103: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Outlet structure</td> | <td>Outlet structure</td> | ||
Line 119: | Line 110: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<th colspan=5>'''Site Restoration'''</th> | <th colspan=5>'''Site Restoration'''</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Filter strip</td> | <td>Filter strip</td> | ||
Line 131: | Line 120: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Soil preparation</td> | <td>Soil preparation</td> | ||
Line 139: | Line 127: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Seeding - above outlet elevation</td> | <td>Seeding - above outlet elevation</td> | ||
Line 154: | Line 141: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Mulch</td> | <td>Mulch</td> | ||
Line 162: | Line 148: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=4>Subtotal</td> | <td colspan=4>Subtotal</td> | ||
Line 179: | Line 164: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=4>TAL CONSTRUCTION COST</td> | <td colspan=4>TAL CONSTRUCTION COST</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<th colspan=5>Annual Operation and Maintenance</th> | <th colspan=5>Annual Operation and Maintenance</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Debris removal</td> | <td>Debris removal</td> | ||
Line 196: | Line 178: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Weed control</td> | <td>Weed control</td> | ||
Line 211: | Line 192: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Replace planting media</td> | <td>Replace planting media</td> | ||
Line 219: | Line 199: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Replace plants</td> | <td>Replace plants</td> | ||
Line 227: | Line 206: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Mow filter strips</td> | <td>Mow filter strips</td> | ||
Line 235: | Line 213: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Erosion repair</td> | <td>Erosion repair</td> | ||
Line 243: | Line 220: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Inspection</td> | <td>Inspection</td> | ||
Line 251: | Line 227: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=4>Subtotal</td> | <td colspan=4>Subtotal</td> | ||
Line 260: | Line 235: | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=4>TOTAL ANNUAL O&M COST</td> | <td colspan=4>TOTAL ANNUAL O&M COST</td> | ||
<td>$0.00</td> | <td>$0.00</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=5>'''Minnesota Location Factors'''</td> | <td colspan=5>'''Minnesota Location Factors'''</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Bemidji</td> | <td colspan=2>Bemidji</td> | ||
<td colspan=3>0.963</td> | <td colspan=3>0.963</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Brainerd</td> | <td colspan=2>Brainerd</td> | ||
<td colspan=3>1.003</td> | <td colspan=3>1.003</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Detroit Lakes</td> | <td colspan=2>Detroit Lakes</td> | ||
<td colspan=3>0.962</td> | <td colspan=3>0.962</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Duluth</td> | <td colspan=2>Duluth</td> | ||
<td colspan=3>0.991</td> | <td colspan=3>0.991</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Mankato</td> | <td colspan=2>Mankato</td> | ||
<td colspan=3>0.990</td> | <td colspan=3>0.990</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Bemidji</td> | <td colspan=2>Bemidji</td> | ||
<td colspan=3>0.963</td> | <td colspan=3>0.963</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Minneapolis</td> | <td colspan=2>Minneapolis</td> | ||
<td colspan=3>1.035</td> | <td colspan=3>1.035</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Rochester</td> | <td colspan=2>Rochester</td> | ||
<td colspan=3>0.983</td> | <td colspan=3>0.983</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>St. Paul</td> | <td colspan=2>St. Paul</td> | ||
<td colspan=3>1.000</td> | <td colspan=3>1.000</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>St. Cloud</td> | <td colspan=2>St. Cloud</td> | ||
<td colspan=3>1.002</td> | <td colspan=3>1.002</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Thief River Falls</td> | <td colspan=2>Thief River Falls</td> | ||
<td colspan=3>1.042</td> | <td colspan=3>1.042</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Willmar</td> | <td colspan=2>Willmar</td> | ||
<td colspan=3>0.961</td> | <td colspan=3>0.961</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=2>Windom</td> | <td colspan=2>Windom</td> | ||
<td colspan=3>0.935</td> | <td colspan=3>0.935</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
</tr> | </tr> | ||
Line 344: | Line 302: | ||
<font size=1>Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation</font size> | <font size=1>Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation</font size> | ||
− | <noinclude>[[category:table]]</noinclude> | + | <noinclude> |
+ | [[category:cost information table]] | ||
+ | </noinclude> |
Bioretention device cost estimate worksheet.
Link to this table
Project Title | ||||
Owner | ||||
Location | ||||
Project Number | ||||
Date | ||||
Description | Units | Quantity | Unit Cost | Total Estimated Price |
---|---|---|---|---|
Site Preparation | ||||
Tree removal - up to 12" diameter | each | $350.00 | $0.00 | |
Clear and grub brush | square yard | $1.50 | $0.00 | |
Tree protection - temp. fence | lineal foot | $3.00 | $0.00 | |
Topsoil - 6" depth, salvage on site | square yard | $4.50 | $0.00 | |
Site Formation | ||||
Excavation - 4' average depth | square yard | $10.00 | $0.00 | |
Grading | square yard | $1.50 | $0.00 | |
Hauling off-site | square yard | $5.50 | $0.00 | |
Structural Components | ||||
Underdrain - with pea gravel and geotextile | lineal foot | $30.00 | $0.00 | |
Inlet structure | each | $1,500.00 | $0.00 | |
Outlet structure | each | $2,500.00 | $0.00 | |
Site Restoration | ||||
Filter strip | square yard | $0.00 | $0.00 | |
Soil preparation | square yard | $30.00 | $0.00 | |
Seeding - above outlet elevation | square yard | $0.50 | $0.00 | |
Planting - below outlet elevation | square yard | $30.00 | $0.00 | |
Mulch | square yard | $5.00 | $0.00 | |
Subtotal | $0.00 | |||
10% Contingencies | $0.00 | |||
Subtotal | $0.00 | |||
Apply MN Location Factor | $0.00 | |||
TAL CONSTRUCTION COST | $0.00 | |||
Annual Operation and Maintenance | ||||
Debris removal | per visit | $50.00 | $0.00 | |
Weed control | per visit | $50.00 | $0.00 | |
Sediment removal | per yeart | $500.00 | $0.00 | |
Replace planting media | square yard | $12.00 | $0.00 | |
Replace plants | per plant | $5.00 | $0.00 | |
Mow filter strips | per visit | $50.00 | $0.00 | |
Erosion repair | square yard | $75.00 | $0.00 | |
Inspection | per visit | $125.00 | $0.00 | |
Subtotal | $0.00 | |||
Apply MN Location Factor | $0.00 | |||
TOTAL ANNUAL O&M COST | $0.00 | |||
Minnesota Location Factors | ||||
Bemidji | 0.963 | |||
Brainerd | 1.003 | |||
Detroit Lakes | 0.962 | |||
Duluth | 0.991 | |||
Mankato | 0.990 | |||
Bemidji | 0.963 | |||
Minneapolis | 1.035 | |||
Rochester | 0.983 | |||
St. Paul | 1.000 | |||
St. Cloud | 1.002 | |||
Thief River Falls | 1.042 | |||
Willmar | 0.961 | |||
Windom | 0.935 | |||
Note: Suggested unit costs are based on RS Means prices for Spring, 2005, then factored into an area basis based on typical design features for Constructed Wetlands BMPs. To be used for preliminary cost estimation