*[[MIDS design sequence flow chart - Box 46]] - Are there adverse surface water hydrologic impacts from infiltration practices (e.g. impacting perched wetland)? | *[[MIDS design sequence flow chart - Box 46]] - Are there adverse surface water hydrologic impacts from infiltration practices (e.g. impacting perched wetland)? | ||
*[[MIDS design sequence flow chart - Box 47]] - Can the BMP be relocated onsite to avoid adverse hydrologic impacts? | *[[MIDS design sequence flow chart - Box 47]] - Can the BMP be relocated onsite to avoid adverse hydrologic impacts? | ||
− | *[[MIDS design sequence flow chart - Box 48]] - Would BMPs | + | *[[MIDS design sequence flow chart - Box 48]] - Would BMPs accommodating Flexible Treatment Option (FTO) 1 avoid adverse hydrologic impacts? |
*[[MIDS design sequence flow chart - Box 49]] - Select FTO Alternative No. 2 | *[[MIDS design sequence flow chart - Box 49]] - Select FTO Alternative No. 2 | ||
**Maximize infiltration BMPs to treat up to the 0.55 inch goal, if possible | **Maximize infiltration BMPs to treat up to the 0.55 inch goal, if possible | ||
Line 88: | Line 88: | ||
*[[MIDS design sequence flow chart - Box 52]] - Do the following conditions apply? | *[[MIDS design sequence flow chart - Box 52]] - Do the following conditions apply? | ||
**Zoning and land use requirements make FTO 2 not feasible; and | **Zoning and land use requirements make FTO 2 not feasible; and | ||
− | **The BMP cannot be relocated to | + | **The BMP cannot be relocated to accommodate zoning and land use restrictions |
*[[MIDS design sequence flow chart - Box 53]] - Do the following conditions apply? | *[[MIDS design sequence flow chart - Box 53]] - Do the following conditions apply? | ||
**There are existing or proposed structures or infrastructure that make FTO 2 not feasible; and | **There are existing or proposed structures or infrastructure that make FTO 2 not feasible; and | ||
Line 94: | Line 94: | ||
*[[MIDS design sequence flow chart - Box 54]] Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.) | *[[MIDS design sequence flow chart - Box 54]] Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.) | ||
**The site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU | **The site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU | ||
− | **Karst is present within 1000 feet of the site and the BMP cannot be | + | **Karst is present within 1000 feet of the site and the BMP cannot be relocated so that it is more than 1000 feet from karst |
**Shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater | **Shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater | ||
**Contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated | **Contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated | ||
− | **Soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with | + | **Soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with an infiltration rate greater than 0.2 inches per hour, and the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams) |
− | **Soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, | + | **Soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, and the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour |
**If no, go to Box 60 | **If no, go to Box 60 | ||
*[[MIDS design sequence flow chart - Box 55]] - Do the following conditions apply? | *[[MIDS design sequence flow chart - Box 55]] - Do the following conditions apply? | ||
Line 109: | Line 109: | ||
*[[MIDS design sequence flow chart - Box 57]] Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.) | *[[MIDS design sequence flow chart - Box 57]] Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.) | ||
**The site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU | **The site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU | ||
− | **Karst is present within 1000 feet of the site and the BMP cannot be | + | **Karst is present within 1000 feet of the site and the BMP cannot be relocated so that it is more than 1000 feet from karst |
**Shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater | **Shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater | ||
**Contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated | **Contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated | ||
− | **Soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with | + | **Soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with an infiltration rate greater than 0.2 inches per hour, and the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams) |
− | **Soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, | + | **Soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, and the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour |
**If no, go to Box 49 | **If no, go to Box 49 | ||
*[[MIDS design sequence flow chart - Box 58]] - Is Flexible Treatment Option (FTO) 2 feasible? | *[[MIDS design sequence flow chart - Box 58]] - Is Flexible Treatment Option (FTO) 2 feasible? | ||
Line 123: | Line 123: | ||
**There are adverse hydrologic impacts from infiltration practices; and | **There are adverse hydrologic impacts from infiltration practices; and | ||
**The BMP cannot be relocated to avoid adverse hydrologic impacts; and | **The BMP cannot be relocated to avoid adverse hydrologic impacts; and | ||
− | **BMPs | + | **BMPs accommodating FTO 1 would avoid adverse hydrologic impacts |
*[[MIDS design sequence flow chart - Box 61]] - Are there existing or proposed structures or infrastructure that make [[Flexible treatment options#Flexible Treatment Option 1 (FTO #1)|Flexible Treatment Option 1]] not feasible? | *[[MIDS design sequence flow chart - Box 61]] - Are there existing or proposed structures or infrastructure that make [[Flexible treatment options#Flexible Treatment Option 1 (FTO #1)|Flexible Treatment Option 1]] not feasible? | ||
*[[MIDS design sequence flow chart - Box 62]] Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.) | *[[MIDS design sequence flow chart - Box 62]] Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.) | ||
**The site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU | **The site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU | ||
− | **Karst is present within 1000 feet of the site and the BMP cannot be | + | **Karst is present within 1000 feet of the site and the BMP cannot be relocated so that it is more than 1000 feet from karst |
**Shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater | **Shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater | ||
**Contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated | **Contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated |
This page summarizes the structure used for the wiki version of the Design Sequence Flow Chart. Note that pages within the wiki version of the flow chart are still under construction. However, the flow chart is functional in that it proceeds through the flow chart and takes you to the correct performance goal. We will continue enhancing the pages within the flow chart as time allows. Please submit suggestions using the Comment box at the bottom of each page in the wiki.