When stormwater drains off a construction site, it carries sediment and other pollutants that harm lakes, streams and wetlands. According to the 1996 National Water Quality Inventory, stormwater runoff is a leading source of water pollution. The U.S. Environmental Protection Agency estimates that 20 to 150 tons of soil per acre are lost every year to stormwater runoff from construction sites.
 +
 
 +
Controlling erosion can significantly reduce the amount of sedimentation and other pollutants transported by runoff from construction sites. To keep Minnesota’s valuable water resources clean the Minnesota Pollution Control Agency (MPCA) issues permits to construction site owners and their operators to prevent stormwater pollution during and after construction.
 +
 
 +
This page provides links to pages that address topics related to construction stormwater.
 +
 
 +
*Construction Stormwater permit
 +
**[http://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit 2013 permit]
 +
**[[Construction stormwater permit overview and permit application]]
 +
**[[Construction stormwater permit and program forms]]
 +
**[[Construction stormwater permit fact sheets]]
 +
**[[Construction stormwater permit general information]]
 +
*[[Sediment control practices]] - Links to a page that provides a portal to information on individual sediment control practices
 +
<!--**[[Sediment control practices - Temporary Construction Entrance]]
 +
**[[Sediment control practices - Cofferdams]]
 +
**[[Sediment control practices - Perimeter Control]]
 +
**[[Sediment control practices - Check Dams]]
 +
**[[Sediment control practices - Storm Drain Inlet Protection]]-->
 +
*[[Erosion prevention practices]] - Links to a page that provides a portal to information on individual erosion prevention practices
 +
<!--**[[Erosion prevention practices - Temporary Seeding and Stabilization]]-->
 +
*[http://stormwater.pca.state.mn.us/index.php/Alleviating_compaction_from_construction_activities Alleviating compaction from construction activities]
 +
*[[Miscellaneous guidance for construction stormwater]]
 +
*[[Links for construction stormwater]]
 +
 
 +
===Construction Stormwater Permit Application===
 +
Click [https://netweb.pca.state.mn.us/private/ '''here'''] to log into the e-Services then once logged in, click on Construction Stormwater General Permit Application
 +
[[file:online logo.jpg|thumb|none|alt=MPCA online logo|[https://netweb.pca.state.mn.us/private/ '''Online Services''']]]
 +
 
 +
Visa, Master cards or checks are accepted for the $400 fee payment.
 +
 
 +
'''A project is NOT eligible for online processing and must complete a paper form if''':
 +
*The project will disturb 50 or more acres AND has a discharge point within one mile of an impaired or [[Special Waters and Impaired Waters|special water]] listed in [[APPENDIX A|Appendix A]] of the construction stormwater general permit AND the discharge flows to these waters. Applications are due 30-days before the anticipated construction start date.
 +
 
 +
 
 +
<!--[[File:Construction stormwater icon.jpg|thumb|300px|alt=icon for construction stormwater]]
  
 
<br>
 
<br>
Line 5: Line 45:
 
<font size=6>Link to the [[Construction stormwater permit]]</font size>
 
<font size=6>Link to the [[Construction stormwater permit]]</font size>
  
<!--===[[Construction Program FAQ]]===-->
+
===[[Construction Program FAQ]]===
<!--[[How to use the CSW Notice of Termination/Permit Modification Form]]-->
+
[[How to use the CSW Notice of Termination/Permit Modification Form]]
  
 
==Overview==
 
==Overview==
Line 67: Line 107:
  
 
'''A project is NOT eligible for online processing and must complete a paper form if''':
 
'''A project is NOT eligible for online processing and must complete a paper form if''':
*The project will disturb 50 or more acres AND has a discharge point within one mile of an impaired or [[Special Waters and Impaired Waters|special water]] listed in [[APPENDIX A|Appendix A]] of the construction stormwater general permit AND the discharge flows to these waters. Applications are due 30-days before the anticipated construction start date.
+
*The project will disturb 50 or more acres AND has a discharge point within one mile of an impaired or [[Special Waters and Impaired Waters|special water]] listed in [[APPENDIX A|Appendix A]] of the construction stormwater general permit AND the discharge flows to these waters. Applications are due 30-days before the anticipated construction start date.-->
  
 
<!--===[[Construction Program FAQ]]===
 
<!--===[[Construction Program FAQ]]===

Revision as of 15:40, 25 February 2016

construction stormwater image</alt>

When stormwater drains off a construction site, it carries sediment and other pollutants that harm lakes, streams and wetlands. According to the 1996 National Water Quality Inventory, stormwater runoff is a leading source of water pollution. The U.S. Environmental Protection Agency estimates that 20 to 150 tons of soil per acre are lost every year to stormwater runoff from construction sites.

Controlling erosion can significantly reduce the amount of sedimentation and other pollutants transported by runoff from construction sites. To keep Minnesota’s valuable water resources clean the Minnesota Pollution Control Agency (MPCA) issues permits to construction site owners and their operators to prevent stormwater pollution during and after construction.

This page provides links to pages that address topics related to construction stormwater.

Construction Stormwater Permit Application

Click here to log into the e-Services then once logged in, click on Construction Stormwater General Permit Application

Visa, Master cards or checks are accepted for the $400 fee payment.

A project is NOT eligible for online processing and must complete a paper form if:

  • The project will disturb 50 or more acres AND has a discharge point within one mile of an impaired or special water listed in Appendix A of the construction stormwater general permit AND the discharge flows to these waters. Applications are due 30-days before the anticipated construction start date.



Special Waters and Impaired Waters