(Created page with " <center><font size=3>''' Construction requirements: Compost blanket application'''.</font size><br> Link to this [[ Construction requirements: Compost blanket application|tab...") |
m |
||
Line 2: | Line 2: | ||
<center><font size=3>''' | <center><font size=3>''' | ||
Construction requirements: Compost blanket application'''.</font size><br> | Construction requirements: Compost blanket application'''.</font size><br> | ||
− | Link to this [[ | + | Link to this [[Construction requirements: Compost blanket application|table]]</center> |
− | Construction requirements: Compost blanket application|table]]</center> | ||
<table class="sortable"><tr> | <table class="sortable"><tr> |
Construction requirements: Compost blanket application.
Annual Rainfall/Flow Rate | Total Precipitation & Rainfall Erosivity Index | Application Rate For Vegetated* Compost Surface Mulch | Application Rate For Unvegetated Compost Surface Mulch |
---|---|---|---|
Low | 1-25”, 20-90 | ½ - ¾ ” (12.5 mm – 19 mm) | 1” – 1 ½” (25 mm – 37.5mm) |
Average | 26-50”, 91-200 | ¾ - 1” (19 mm – 25 mm) | 1 ½” – 2” (37 mm – 50 mm) |
High | 51” and above, 201 and above | 1-2” (25 mm – 50 mm) | 2-4” (50mm – 100mm) |
*These lower application rates should only be used in conjunction with seeding, and for compost blankets applied during the prescribed planting season for the particular region. |