m
Line 1: Line 1:
 
+
Energy dissipation has been installed at pipe outlet. Energy dissipation must be installed at pipe outlet within 24 hours after connection to a surface water.

Revision as of 14:05, 10 January 2017

Energy dissipation has been installed at pipe outlet. Energy dissipation must be installed at pipe outlet within 24 hours after connection to a surface water.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:13, 3 November 2016Thumbnail for version as of 16:13, 3 November 20162,304 × 1,728 (1.7 MB)Mtrojan (talk | contribs)

Metadata